Multi-scene dynamic enterprise comprehensive evaluation method and system
A comprehensive evaluation and multi-scenario technology, which is applied in the field of multi-scenario dynamic enterprise comprehensive evaluation methods and systems, can solve problems such as being unable to start, energy and judgment not being able to score with multiple index systems, and losing good characteristic index systems, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0078] This embodiment provides a technical solution: a multi-scenario dynamic enterprise comprehensive evaluation method, comprising the following steps:
[0079] S1: Clean data
[0080] Clean abnormal data;
[0081] S2: Build a feature index evaluation system
[0082] By calculating the distance correlation coefficient between each input feature and all other features in the database separately, find the feature with the largest correlation coefficient and set it into the feature index evaluation system;
[0083] S3: Empowerment evaluation indicators
[0084] Based on the characteristic index in the characteristic index evaluation system constructed in step S2 and the enterprise used to calculate the weight, the corresponding data is obtained from the database to obtain the sample matrix, and the principal component analysis is performed on the sample matrix to obtain the analysis result, and then the primary weight model is obtained. , and then construct a comprehensive ...
Embodiment 2
[0146] This embodiment proposes a multi-scenario dynamic enterprise comprehensive evaluation model based on distance correlation coefficient and principal component analysis method. like figure 1 As shown, the main operation steps of this multi-scenario dynamic enterprise comprehensive evaluation model are as follows:
[0147] S1: cleaning data, mainly dealing with abnormal data;
[0148] S2: Build a feature index evaluation system;
[0149] S3: Empowerment evaluation index;
[0150] S4: Calculate the comprehensive score of all enterprises, compare and sort.
[0151] In this embodiment, the detailed processing process of each step is as follows:
[0152] S1: cleaning data, mainly dealing with abnormal data
[0153] Consider that the actual data is the data from the large enterprise database. Although the data in the database is relatively complete and structured, in order to ensure that the next steps can extract reasonably accurate information from the data, the process...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


