A building structure and large-area technology, applied to building components, building structures, buildings, etc., can solve problems such as the inability to pre-determine the position of the well opening, the inconvenience of building the air duct well, and the inability to determine the position of the tenant.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] Attached to the following Figure 1-6This application will be described in further detail.
[0039] The embodiment of the present application discloses a large-area air duct shaft building structure of a factory building.
[0040] refer to figure 1 , a large-area air duct shaft building structure of a factory building includes a plurality of steel beams 1, and the steel beams 1 are laid in the same horizontal plane in a horizontal and vertical manner to form a mesh structure with several installation cavities 11.
[0041] refer to figure 1 and figure 2 , in the installation cavity 11, a floor plate 2 is arranged horizontally, the floor plate 2 is connected with the steel beam 1 through the connecting component 3, a bottom plate 21 is horizontally arranged below the installation cavity 11, and an elastic component 5 is arranged between the floor plate 21 and the steel beam 1; 2. A telescopic rod 22 is prefabricated in the bottom. The telescopic rod 22 is composed of...