Post-grouting expansive underground pipeline joint plugging structure
An underground pipeline, expansive technology, applied in the direction of pipes/pipe joints/pipe fittings, pipes, landfill technology, etc., can solve the problems of easy cracking of joints, uneven settlement, leakage, etc. Simple structure and convenient installation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0033] The difference from Embodiment 1 is that a pressure sensor is arranged in the cavity, and the pressure sensor transmits the collected pressure to the controller. When the pressure decreases to a certain value, the controller transmits the alarm information to the alarm device. In order to deal with leakage problems in a timely manner.
[0034] The invention is applied to the joint positions of underground drainage (sewage) pipelines and inspection wells to fill the gaps between pipelines and reserved holes. After the injected slurry solidifies, the strength will be further improved, and there will be no leakage after plugging, high durability, and deformation coordination ability. powerful.
Embodiment 3
[0036] A method for plugging a post-grouting expansive underground pipeline joint, the method adopts the post-grouting expansive underground pipeline joint of Embodiment 1 or Embodiment 2 to block, and the method comprises the following steps:
[0037] 1. Determine the size of the flexible pipe body 1 according to the size of the pipe (the inner diameter D of the flexible pipe body 1 is determined according to the size of the pipe);
[0038] 2. Set the flexible pipe body 1 on the outer wall of the pipeline 5 and install it in the reserved hole of the inspection well 4 together;
[0039] 3. Through the grouting hole 2, inject the slurry into the inner cavity 3. Under the action of pressure, the flexible pipe body 1 fills the gap between the pipe 1 and the wall of the hole;
[0040] 4. Detect the reliability of filling and plugging, and determine whether secondary pressure grouting is required;
[0041] 5. After the slurry solidifies, the plugging is completed.
PUM
| Property | Measurement | Unit |
|---|---|---|
| Tube wall thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com