Wall surface damage repairing equipment for urban construction
A kind of urban construction and wall surface technology, which is applied in the direction of building maintenance, construction, building construction, etc., can solve the problems of large manpower consumption, inconvenient staff, a large amount of manpower, etc., and achieve the effect of reducing cost and avoiding uneven application
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] A wall damage repair equipment for urban construction, please check Figure 1-8 , including a frame 1, a first sliding block 100, a charging box 2, a plug cover 3, a telescopic tube 4, a material spraying mechanism 5, a repairing mechanism 6 and a moving mechanism 7, the left and right sides of the frame 1 are connected with a first sliding Block 100, the inside of the frame 1 is connected with a charging box 2 by welding, the right rear side of the charging box 2 is screwed with a plug cover 3, and the right rear side of the charging box 2 is connected with a telescopic tube 4, and the telescopic tube 4 is located in the On the right side of the plug cover 3 , the bottom of the telescopic tube 4 is provided with a material spraying mechanism 5 , the top of the frame 1 is provided with a repair mechanism 6 , and the rear side of the material spraying mechanism 5 is provided with a moving mechanism 7 .
[0034] please check figure 1 and Figure 4 , the spraying mechani...
Embodiment 2
[0039] On the basis of Example 1, please see figure 1 and Figure 9 , and also includes a scraping mechanism 8, the scraping mechanism 8 includes a first fixing block 81, a first screw rod 82, a scraper 83 and a nut 84, and the right front side of the sliding frame 62 is connected with a first fixing block 81 by welding, A first screw rod 82 is placed on the right side of the first fixing block 81 , a nut 84 is threadedly connected to the upper side of the first screw rod 82 , the nut 84 is in contact with the first fixing block 81 , and the bottom of the first screw rod 82 is welded A scraper 83 is attached, and the scraper 83 is in contact with the brush cylinder 65 .
[0040] When the brush cylinder 65 moves to the right to paint the wall, the sliding frame 62 will drive the first fixing block 81, the first screw rod 82, the scraper 83 and the nut 84 to move to the right together. , the latex paint will accumulate on the brush cylinder 65, and then under the action of the...
Embodiment 3
[0042] On the basis of Example 2, please see figure 1 and Figure 10 , and also includes an adjustment mechanism 9, the adjustment mechanism 9 includes a fixed plate 91, a second fixed block 92, a second screw rod 93 and a handle 94, and the two first sliding blocks 100 away from each other are slidably connected front and rear symmetrically There is a fixed plate 91, a second fixed block 92 is welded symmetrically up and down between the two fixed plates 91 on the right side, and a second screw rod 93 is rotatably connected between the two second fixed blocks 92. The first sliding block 100 on the right side is threaded, and the bottom of the second screw rod 93 is connected with a handle 94 by welding.
[0043] When the equipment needs to be used, firstly, the staff prepares two fixing brackets, and installs the fixing brackets on the left and right sides of the wall to be painted, and then installs the fixing plates 91 on both sides of the equipment respectively through bo...