Equipment cost verification method and device based on LCC model
A technology of equipment cost and model, applied in data processing applications, instruments, calculations, etc., can solve problems such as the evaluation of the pros and cons of the whole life cycle cost of power equipment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0056] The present invention will be described in further detail below in conjunction with the description of the drawings and specific embodiments.
[0057] see figure 1 , an equipment cost verification method based on LCC model, the method includes the following steps:
[0058] S1. Obtain N source cost data sets of N substation equipment in the same full life cycle, each source cost data set includes initial investment data, operation and maintenance cost data, maintenance cost data and fault cost data for the substation equipment , N≥2;
[0059] If there are two substations, the two devices can be divided into one indoor substation and one outdoor substation; if there are four substations, the four substations can be divided into two indoor substations and one outdoor substation. Two substations located outdoors;
[0060] The initial investment data and failure cost data of the substation equipment are transferred from the ERP system to the designated folder, and the ope...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com