Set-up method for generalized Bingham soft soil rheological deformation analogue body
A method for establishing a Bingheim body, which is applied in the field of establishing a generalized Bingheim soft soil rheological deformation simulation body, can solve the problems of flood control and flood control, large subsidence and deformation of the subgrade, and vehicle jumping, etc., so as to save maintenance costs , reduce economic losses, obvious economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The establishment method of generalized Binheim soft soil rheological deformation simulation of the present invention is an example illustration at the expressway K20+395 place of four lanes in the Lianyungang section of Lianxu Expressway, embankment height 5m, embankment top width 28m, bottom width 43m, The average bulk density of the embankment is generally taken as 20kN / m 3 The soft soil foundation is relatively simple, the thickness of the soft soil is 12m, and the soil layer under the soft soil layer is also relatively single and uniform. The treatment length of the mixing pile is 12.5m, the pile spacing is 1.2m, and the replacement rate is 0.157. a. Input the design parameters of the embankment, namely, embankment crest, bottom width, embankment height, and average bulk density; the specific values are 28, 43, 5, and 20 respectively;
[0026] b. Input the composite foundation treatment parameters, namely treatment depth, replacement rate and soil layer parameter...