Wide area measurement WAMS main station/sub station simulating method
A wide-area measurement system and sub-station technology, which is applied in the field of power system and its automation, can solve the problem of no wide-area measurement WAMS master station/sub station simulation method, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] Using a PC, its configuration requirements are:
[0041] Processor: Pentium 800MHz, or higher
[0042] Memory: 256M, or higher configuration
[0043] Hard disk: 50M, or more than 50M space
[0044] Display: 1024×768, or higher resolution
[0045] Network card: 10M / 100M, Ethernet
[0046] Operating system: Microsoft Windows 2000 / XP
[0047] Simulation master function:
[0048] Completely realize the transmission and processing of all real-time data pipelines, command pipelines, and offline data pipelines defined in the power industry standard "Technical Specifications for Real-time Dynamic Detection System of Power Systems":
[0049] Real-time data pipeline:
[0050] It is opened or closed by the command pipe control, and receives the real-time measurement phasor data sent by the data concentrator / PMU device.
[0051] Command pipeline:
[0052] Send commands to the data concentrator / PMU device, the commands include: heartbeat signal, system reset, download config...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com