Steel structure assisted layered installation and construction method for superhigh PRC partition plate
A construction method and technology of steel structure, applied in the direction of walls, building components, building structures, etc., can solve the problems of difficult construction of super high partition walls, and achieve the effect of simple construction and low cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0049] The embodiment is shown in Figure 1-5. When installing the PRC lightweight composite partition wall, for the wall with a height of more than 5.5 meters, the installation is planned to be installed by the steel structure auxiliary layered installation method, that is, along the length of the wall, every Install a steel structure column 3 at about 4 meters, and install a steel structure beam 7 at intervals of about 5 meters along the height direction of the wall body. The positions of the steel structure columns 3 and the steel structure beams 7 can be adjusted appropriately according to the actual size of the wall and the specifications of the PRC lightweight composite partition wall panels.
[0050] The specific construction process of super-high and super-long PRC partition wall steel structure auxiliary layered installation is as follows:
[0051] Step 1: Determine the position of the steel structure column feet and beam connectors according to the drawings and on-sit...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com