Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

7results about How to "Improve anti-settling" patented technology

Waterborne epoxy micaceous iron coating as well as preparation method and application thereof

The invention discloses a waterborne epoxy micaceous iron coating and a preparation method and application thereof, and relates to the technical field of anticorrosive paints.The waterborne epoxy micaceous iron coating comprises a component A and a component B. The component A and the component B are prepared from raw materials including the following components: the component A comprises waterborne epoxy emulsion, micaceous iron ash, an anti-settling agent, pigment filler and an auxiliary A; the component B comprises a waterborne epoxy curing agent; the component A is prepared from the following components in parts by weight: 100 parts of waterborne epoxy emulsion; 20-170 parts by weight of micaceous iron ash; 0.5-6 parts by weight of an anti-settling agent; 20-80 parts by weight of pigment and filler; 1-8 parts by weight of an auxiliary agent A; the component B comprises the following components in parts by weight: 100 parts of a waterborne epoxy curing agent; the weight ratio of the component A to the component B is (8-12): 1. The waterborne epoxy micaceous iron coating disclosed by the invention has the advantages of low VOC (Volatile Organic Compounds), relatively good sealing property, sagging prevention, sedimentation prevention, high adhesive force and the like.
Owner:MARINE CHEM RES INST CO LTD

A multifunctional artificial field ridge

This utility model discloses a multifunctional artificial field ridge, relating to the field of agricultural facility technology. It includes several main units that interlock along their length. Each main unit has a support leg embedded in the soil at its base, and an arched structure with a downward-facing arc-shaped opening between two legs. Side plates are located on both sides along the length or short side of each main unit. A mulch film fixing clip is attached to the side plate of the main unit, having a slot for fixing the edge of the mulch film. A pre-drilled hole is located on the side plate of the main unit. A pipe fixing clip is also located on the side plate of the main unit, with a buckle inserted into the pre-drilled hole on the side facing the main unit. By integrating multiple functional components such as the mulch film fixing clip, pipe fixing clip, and support fixing block onto the side plate of the main unit, the efficiency of mulch film laying, irrigation pipe installation, and protective facility construction is improved, while significantly reducing on-site construction complexity and the required labor.
Owner:张霂然

Two-component spray unsaturated polyester resin putty and preparation method thereof

ActiveCN118879113BImprove surface drynessfast dryingFilling pastes
The present invention relates to a two-component spraying unsaturated polyester resin putty and a preparation method thereof, belonging to the technical field of unsaturated polyester resin putty, and the preparation method comprises the following steps: S1, using phthalic anhydride, hexylene glycol, triethylene glycol, linoleic acid, propylene glycol, neopentyl glycol, a catalyst and maleic anhydride to make a self-made resin; S2, taking the self-made resin and adding zinc stearate, montmorillonite, precipitated white carbon black, titanium dioxide, accelerator, inhibitor, poly [1-(methoxycarbonylmethyl)ethylene] and styrene to prepare the main ash; S3, preparing a putty finished product. The present invention adds linoleic acid and triethylene glycol to accelerate the surface dryness of the putty; in addition, the present invention also uses zinc stearate, montmorillonite, precipitated white carbon black and titanium dioxide in combination, and synergistically improves the polishability of the unsaturated polyester resin putty. The addition of poly [1-(methoxycarbonylmethyl)ethylene] increases the anti-settling effect of the filler and prolongs the storage period of the finished product.
Owner:YINGDE RONGCHANG CHEM IND CO LTD

Adhesive removal composition, preparation method and adhesive removal method thereof

This invention relates to a degumming composition, its preparation method, and the degumming method thereof. The degumming composition comprises the following components in weight percentages: 84%–93.5% degumming solvent, 3%–5% solvent oil, 0.5%–3% solid wax, 1%–3% organobentonite, and 2%–5% polar activator; wherein the degumming solvent includes one or more of dichloromethane, N-methylpyrrolidone, and ethylene glycol monobutyl ether. This invention combines the degumming solvent, solid wax, solvent oil, organobentonite, and polar activator in a specific ratio, achieving synergistic effects among the components to obtain a degumming composition with slow evaporation and short degumming time.
Owner:ZHAOQING ODIS IND CO LTD

Anti-settlement facility for highway subgrade

ActiveCN222541180UIncreased horizontal contact areastable supportRoadwaysMechanical engineeringSubgrade
The utility model discloses a highway subgrade anti-settlement facility, which relates to the technical field of subgrade, and comprises a subgrade body, a fixing mechanism is arranged on the lower surface of the subgrade body, the fixing mechanism comprises a connecting pipe and a separating pipe, the inner wall of the connecting pipe is fixedly connected with an anti-oxidation layer, and the inner wall of the anti-oxidation layer is fixedly connected with a protective layer. The separating pipe is inserted into the connecting pipe, a baffle is fixedly connected to the lower surface of the separating pipe, and an inserting rod is fixedly connected to the axis of the baffle. According to the utility model, the insertion rod is inserted into the center of the pit hole, so that the baffle plate is attached to the inner bottom wall of the pit hole, the baffle plate increases the horizontal contact area between the roadbed and the ground, soil enters the insertion groove in the insertion rod insertion process, the communication hole is attached to the soil, and the soil inside the insertion groove and the soil outside the insertion groove form a whole, so that the insertion rod is not easy to move downwards; and the prefabricated part is better supported, and sedimentation prevention is improved.
Owner:ANHUI YUYUAN ROAD & BRIDGE ENG CO LTD

Application to coating of ultra-corrosion-resistant cold and hot water-resistant circulating pipeline inner wall protective paint

The invention relates to ultra-corrosion-resistant cold and hot water-resistant circulating pipeline inner wall protective paint. The coating is prepared from the following raw materials: epoxy modified phenolic resin, polyether modified polydimethylsiloxane, a dispersing agent, a flatting agent and the like. According to the invention, phenolic epoxy modified resin is used as matrix resin, so that the paint has good corrosion resistance, heat resistance and adhesive force; the polyether modified polydimethylsiloxane is added, so that the surface tension of a coating film is greatly reduced, the passing resistance of water in a pipe is reduced, and the adhesive force of a paint film is improved; the graphene is added, so that the corrosion resistance of the coating film is greatly improved. By changing the surface tension of a paint film and improving the adhesive force of the paint film and a substrate, the salt fog resistance of the paint film reaches 1500 hours; by using the epoxy modified phenolic resin, graphene and other raw materials, the acid and alkali resistance reaches 1500 hours, the standard EN877 of the European Union for cast iron pipes and fittings for building drainage as well as joints and accessories thereof is met, and the blank that no pipe inner wall coating meeting the EN877 standard exists in China is filled.
Owner:TIANJIN COLOROAD COATING & CHEM

Temporary supporting structure for underground excavation tunnel

The utility model relates to the technical field of tunnel construction, and discloses a temporary support structure for subsurface excavation of a tunnel, which comprises a support column, a chassis, a top column top plate and an attached plate, the chassis is arranged at the bottom end of the support column, and the upper surface of the chassis is fixedly connected with a top pile. According to the temporary supporting structure for the subsurface tunnel, the supporting columns are matched with the bottom holes and the top piles of the chassis in an inserted mode, so that rapid positioning and anti-overturning stability of the foundation structure are achieved; the height of the jacking column is adjusted through threads of the internal thread cylinder, different tunnel section supporting requirements are met, the handle provides a manual screwing operation fulcrum, and the adjusting process is simplified; the top plate and the attached plate form an extensible connecting structure through the first edge groove, the second edge groove and the link block, transverse fine adjustment is allowed, and rock stratum pressure is dispersed. The sliding groove of the attached plate is combined with the clamping block and the thread adjusting assembly of the first supporting rod and the second supporting rod, multi-stage height compensation and settlement adaptation are achieved, and the limiting clamping groove limits the axial stress direction of the supporting rod assembly.
Owner:BEIJING XINBO HONGYE MUNICIPAL ENG CO LTD