Synchronous anaerobic denitrification and desulfurization process
A denitrification and process technology, which is applied in the field of synchronous anaerobic denitrification and desulfurization process, can solve the problems of consumption, achieve the effect of saving oxygenation energy consumption and realizing the effect of recycling waste
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] In the synchronous anaerobic denitrification and desulfurization reactor, the anaerobic digested sludge of the municipal sewage treatment plant is used as the inoculum, and the ratio of nitrite to sulfide (mol / mol) is about 2:3. Start the synchronous anaerobic denitrification and desulfurization reactor. The main process conditions controlled are: the hydraulic retention time is 2.0 days, the nitrite and sulfide (matrix) concentrations are 21mg N / L and 32mg S / L, respectively, the reaction temperature is 30°C, and the pH is about 7. The process can simultaneously remove sulfide and nitrite, the concentration of sulfide in the effluent is less than 1mgS / L, and the removal rates of sulfide and nitrite are 98.8% and 94.7%, respectively.
Embodiment 2
[0014] The anaerobic digested sludge of the municipal sewage treatment plant is used as the inoculum, and the simulated wastewater with a ratio of nitrite to sulfide (mol / mol) of about 12:3 is used to run the denitrification and desulfurization process. The main process conditions controlled: hydraulic retention time is 1.0d, nitrite and sulfide concentration (matrix) concentration is 3325mgN / L and 1900mg S / L, reaction temperature is 35℃, pH value is about 7. The volume removal load of sulfide and nitrite reached 1.918kg S / (m 3 ·D) and 2.03kg N / (m 3 · D).
Embodiment 3
[0016] The anaerobic digested sludge of a municipal sewage treatment plant is used as an inoculum to simultaneously remove sulfide and nitrite. The main process conditions controlled are: the hydraulic retention time is 2.0 days, the nitrite and sulfide (matrix) concentrations are 2270 mg N / L and 1920 mg S / L, respectively, the reaction temperature is 30°C, and the pH is about 9. The process can remove sulfide and nitrite at the same time, and the volume removal load of sulfide and nitrite is 0.73kg S / (m 3 ·D) and 0.96kg N / (m 3 · D).
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com