Method for consolidating mud soft base by explosion and piling prepressing united drainage
A technology of drainage consolidation and surcharge preloading, which is applied in soil protection, infrastructure engineering, construction, etc., can solve the problems of poor engineering application and poor consolidation effect, so as to improve the consolidation rate and accelerate the matrix The effect of drainage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] Lay the geotextile manually; lay a 50cm-thick sand cushion 2 on the geotextile 1, and use clean medium-coarse sand as much as possible for the sand cushion. Explosive packs 4 are vertically buried in the center of each grid. In order to prevent the explosives from getting wet, waterproof explosives are generally used. The charge of the packs is controlled at about 150g. The distance between the uppermost charge and the surface layer of the silt 6 is 3.5-4.5m; after the charge is detonated, the stone material 5 is preloaded on the sand cushion layer 2, and the stone material can be stacked in layers to control the loading speed and prevent the silt Shearing damages the drainage board and sideslip. One month after the completion of the first riprap loading, the second loading will be carried out, and the number of loadings will be controlled according to the needs of the project.
Embodiment 2
[0020] Insert plastic drainage boards 3 on the laid sand cushion layer 2, the plastic drainage boards 3 are arranged in a grid pattern, the distance between the drainage boards is 2-2.5m, and the vertical direction runs through the full thickness of the soft foundation and is buried in the underlying layer 7 , the upper end is 20cm higher than the drainage sand cushion; before detonating the explosive package, load stone 5 on the sand cushion 2, and the rest of the operations are the same as in Example 1.
[0021] In the later stage of the explosion, due to the long-term extrusion effect of the surcharge preload, the water in the matrix can be discharged more thoroughly, and the consolidation efficiency is higher.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com