Method and device for updating task content in project task plan system
A technology for task planning and task content, applied in computing, special data processing applications, instruments, etc., can solve problems such as inaccurate task content, update errors, and non-updating, so as to avoid information islands, improve management and control, and ensure synchronization sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039]In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0040] The present invention proposes a method for updating task content in the project task planning system. The method includes: setting corresponding task output records for tasks in the project task planning system in advance; Corresponding tasks in the task planning system are associated; when it is detected that the order has received business data, use the business data in the order to update the task output record corresponding to the task associated with the order, wherein the task output record includes : A combination of any one or more of actual output materials, actual output quantities, actual start time, actual completion time, target document information, and progress information.
[0041] It can be seen that in the present inventio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com