A transmission method for data packet
A transmission method and data packet technology, applied in the field of data packet transmission, can solve the problems of increasing control signaling overhead, increasing control signaling overhead, etc., to achieve the effect of avoiding conflicts and reducing the probability of conflicts
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0065] In this embodiment, taking the VoIP service as an example, when pre-allocating persistent scheduling resources for data packets in the active period, the base station allocates persistent scheduling resources in a period of 2N Bundling processes, and each resource period includes 2 persistent scheduling resources. Among them, N is the maximum number of Bundling processes. In configuration 0 and configuration 6, N is 3; in configuration 1, N is 2.
[0066] Figure 9 It is a schematic diagram of persistent scheduling resource distribution taking configuration 0 as an example in this embodiment. Such as Figure 9 As shown, 6 processes are a resource cycle, and each resource cycle includes 2 persistent scheduling resources, and these two persistent scheduling resources use different Bundling processes. Taking the first resource cycle as an example, TB1 uses Bundling process 1 , TB2 uses Bundling process 2, and the average time interval between TB1 and TB2, TB2 and TB3 is...
Embodiment 2
[0072] In this embodiment, still taking the VoIP service as an example, when pre-allocating persistent scheduling resources for data packets in the active period, the base station allocates persistent scheduling resources in a period of 3N Bundling processes, and each resource period includes 3 persistent scheduling resources. Among them, N is the maximum number of Bundling processes.
[0073] Figure 10 It is a schematic diagram of persistent scheduling resource distribution taking configuration 0 as an example in this embodiment. Such as Figure 10 As shown, 9 processes are one resource cycle, and each resource cycle includes 3 persistent scheduling resources, and two adjacent persistent scheduling resources use different Bundling processes, more preferably, different Bundling processes in each resource scheduling cycle Continuous scheduling resources use different Bundling processes. Taking the first resource cycle as an example, TB1 uses Bundling process 1, TB2 uses Bun...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 