High-speed train body alternation pneumatic load test device
A technology for aerodynamic loads and high-speed trains, which is applied in aerodynamic tests, measuring devices, and testing of machine/structural components. It can solve problems that do not involve fatigue strength testing methods and means, and achieve simple and reasonable structure and strong operability. , the effect of high data reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] The air inlet of the blower GF is connected to the valves F1 and F3, and the muffler X1 and the air filter L are connected in sequence before the valve F1;
[0025] The air outlet of blower GF is connected to valves F2 and F4, and after valve F2 is connected to muffler X2;
[0026] The valves F3 and F4 are connected in series with the flow sensors P1-P2 and the safety valve AF to the vehicle body 6 under test through pipelines. In this embodiment, the safety valve AF is connected after the valve F4 and before the vehicle body 6 to be tested, and the flow sensors P1 and P2 are respectively connected after the valves F3 and F4 and before the vehicle body 6 to be tested.
[0027] The central console 1 is electrically connected to the blower GF, valves F1-F4, flow regulating valves Q1-Q2, temperature sensor 2, displacement sensor 3, pressure sensor 4, strain sensor 5 and safety valve AF.
Embodiment 2
[0029] Add on the basis of the example:
[0030] The valves F1 and F3 are matched with one-way valves D1 and D3, and the one-way valves D1 and D3 are arranged face to face. The valves F2 and F4 are matched with one-way valves D2 and D4, and the one-way valves D2 and D4 are arranged face to face.
[0031] Flow regulating valves Q1-Q2 are connected in series after the valves F3 and F4.
[0032] The safety valve AF is connected in series after the valves F3 and F4.
[0033] By analogy, other embodiments are no longer exhaustive.
[0034] working principle:
[0035] Take the vehicle length of the tested vehicle body 6=about 25 meters as an example, carry out the following settings in advance in the central console 1: the inflation time is 5 minutes, the exhaust time is 5 minutes, the number of tests is 100,000 times, the pressure amplitude in the vehicle body The value is 4000 Pa, the positive pressure relief value of the safety valve AF is 5000 Pa, and the negative pressure r...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 