Installation process and tooling of impeller casing of marine water jet propulsion device
A technology for water jet propulsion and installation technology, which is applied in ship propulsion, positioning devices, propulsion components, etc., can solve the problems of affecting the progress of the project, low measurement accuracy, large errors, etc., to improve labor efficiency, improve positioning accuracy, and simplify effect of work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] like figure 1 , 2 The tooling shown includes a shaft tube 4 and an outer circular plate 2 installed on the periphery of the shaft tube 4. The outer circular plate 2 is provided with a tooling positioning notch 1 corresponding to the size of the impeller cover positioning notch, and a top screw hole for tooling removal. 11. Install the liner 3 between the outer circular plate 2 and the shaft tube 4 to strengthen the connection between the outer circular plate 2 and the shaft tube 4 . Process the frock according to the drawing according to the measured size of the seam of the impeller cover 6. The adjustment device 14 includes a translation top code bolt 7 , a forward top code bolt 8 , a rearward top code bolt 9 and an adjustment device connecting bolt 10 .
[0024] The installation of the impeller cover of the water jet propulsion device using this tooling specifically includes the following steps:
[0025] Install tooling installation bolts 12 on the positioning notc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 