Method for constructing underground space by shield-shallow buried covered excavation composite method
A technology of shallow burial and underground excavation, which is applied in underground chambers, earthwork drilling, wellbore lining, etc., can solve the problem that a single construction method cannot give full play to its advantages, and achieves shortened construction period, fast construction speed, and reduced waste. The effect of the amount of work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] Embodiment one sees Figure 1 to Figure 5 As shown, a construction method for constructing an underground space with a shield-shallow buried excavation compound method, the steps are as follows:
[0048] Step 1, excavating the construction shaft 9 at the planned construction end;
[0049] Step 2: Determine the diameters of two or more shield tunnels 1 to be built in advance according to the size of the excavation section and the functional requirements of the project, and then, in the construction shaft 9, use the shield tunneling method to advance to the extension direction of the underground space to be constructed Construct the shield tunnel 1, and pre-embed the steel plate on the top segment of the shield tunnel during the shield construction process, and construct the inner support structure in the completed shield tunnel;
[0050] Step 3: In the construction shaft 9, the upper part 2 of the soil between two adjacent shield tunnels is excavated by the shallow buri...
Embodiment 2
[0063] Embodiment two see Figure 6 ~ Figure 9 Shown, this is to utilize the inventive method to build underground highway traffic tunnel, according to the inventive method, at first build three shield tunnels. Temporary supports 6 are respectively erected in the shield tunnels on both sides to stabilize the tunnel structure; a central column 14 is constructed inside the shield tunnel in the middle. According to the requirements of engineering functions, a position can be reserved on the central column 14 as a communication channel for the up and down tunnel structure. According to the method of the invention, the upper part of the soil between two adjacent shield tunnel structures is excavated, and the top and bottom primary linings of the shield tunnels are applied. Then part of the segment structure of the three shield tunnels built in advance is removed, and then the bottom two lining structure 10 and the top two lining structure 11 of the tunnel structure are constructed...
Embodiment 3
[0065] Embodiment three see Figure 10 ~ Figure 12 As shown, it is a specific implementation method for constructing a large section crossing line of a subway shield tunnel using the method of the present invention. Dig the soil between the two shield tunnels that have been built. The large-section crossing line 16 between the subway shield tunnels can be completed by sequentially performing the primary lining on the top, the primary lining on the bottom, erecting supports, and dismantling some segments on the shield tunnels.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com