[0015] As shown in the figure, the construction method of the box girder internal formwork without dismantling in this embodiment includes the following steps:
[0016] (1) Prepare asbestos boards with a thickness of 5mm as the inner formwork 4 of the box girder; the secondary corrugation, main corrugation, and columns are made of magnesia, and are formed in pieces in the processing plant according to the section size of the box room, and transported to the site for installation. To the spacing of 500-600mm;
[0017] (2) A 50×50mm square timber reinforcement is arranged longitudinally at the joints of the rib 1, the web 2, the roof 3, and the transverse beam;
[0018] (3) The connecting plate between the column and the main flute is connected with steel nails.
[0019] In the construction method of the above-mentioned inner formwork of box girder without dismantling, the second corrugated section is 15×40mm, and the spacing is 400mm; the main corrugated section is 50×100mm, a...