U-PVC (Unplasticized Polyvinyl Chloride) steel band spiral pipe and preparation method thereof
A technology for winding pipes and steel strips, applied in the direction of pipes, rigid pipes, mechanical equipment, etc., can solve the problems of high cost and large material consumption, and achieve the effect of low cost, high displacement resistance and cost reduction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] First, the U-PVC material is extruded through the extruder to extrude the cross section as Figure 4 , 5 The U-PVC strip 6 shown includes a base plate 61 and an upper cover 62. Then the U-PVC strip 6 is heated by a tunnel heater for about 2 minutes, so that the temperature of the U-PVC strip 6 reaches 85°C. The temperature is maintained, and the steel belt 7 is fed into a winding forming machine for winding to form a U-PVC pipe.
Embodiment 2
[0029] First, the U-PVC material is extruded through the extruder to extrude the cross section as Figure 4 , 5 The U-PVC strip 6 shown, including a base plate 61 and an upper cover 62, is fed into a winding forming machine together with the steel strip 7 to be wound to form a U-PVC pipe, and then the shaped U-PVC winding pipe 1 is passed through a tunnel type The heater heats for about 2 minutes to bring the pipe temperature to 75°C.
Embodiment 3
[0031] First, the cross section of the PVC material is extruded through the extruder as Figure 4 , 5 The U-PVC strip 6 shown includes a base plate 61 and an upper cover 62. Then the U-PVC strip 6 is heated by a tunnel heater for about 1 minute, so that the temperature of the U-PVC strip 6 reaches 55°C. The temperature is maintained, and the steel belt 7 is fed into the winding forming machine for winding to form a U-PVC pipe, and then the pipe is heated by the tunnel heater 4 for about 3 minutes, so that the pipe temperature reaches 100°C.
[0032] The U-PVC material in the present invention has lower cost and higher hardness than the currently commonly used PE material. Under the condition of achieving the same performance, the PVC winding pipe with steel belt can save 30%-60% of PVC material and reduce the cost by 20%-50% compared with the existing pure PVC winding pipe, which is of great significance for practical applications.
[0033] Take pipe ring stiffness S2 (8KN / m 2 ) Gr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 