Sleeper bolting elastic road junction
A crossing and bolting technology, which is applied in the field of crossings, can solve the problems of mechanical wear and decay of wooden pavement, poor combination of concrete plates, cracks, deformation, softness and damage, etc., to achieve enhanced overall stability and aesthetics, and good vibration reduction Noise reduction performance and stability, the effect of preventing overall sinking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Embodiment 1: the pillow body bolted elastic crossing of ordinary plane laying (referring to figure 1 the right half of figure 2 and 3 ), including rubber pavement 1, crossing prestressed concrete sleeper 2, connecting screw 3, C-type boltless fastener 4 and under-rail buffer pad 5, and described rubber pavement 1 includes middle pavement 11, outer pavement 12 , the crossing prestressed concrete sleeper 2 is laid on the railway subgrade 6, the rail 7 is fixed on the crossing prestressed concrete sleeper 2 through the C-type boltless fastener 4, and a rail is arranged between the rail 7 and the crossing prestressed concrete sleeper 2 Lower buffer pad 5; the middle paving panel 11 is laid between the two rails 7, and the outer paving panel 12 is respectively laid on the outside of the two rails 7, and the middle is paved with the connecting screw 3 The panel 11 and the outer paving panel 12 are connected and fixed with the pre-embedded nylon sleeve 45 above the prestre...
Embodiment 2
[0034] Embodiment 2: The pillow body bolted elastic crossing of single protective plane laying (referring to figure 1 the left half of figure 2 and 3 , 5, 6), and embodiment 1 difference is that a guard rail 8 is housed in the inboard of a rail 7.
[0035] see Figure 5 and Figure 6 , the guard rail 8 is fixed on the under-rail buffer pad 5 above the crossing prestressed concrete sleeper 2 through another C-type boltless fastener 4, between the guard rail 8 and the rail 7 A spacer iron 9 is provided, and the rail 7, the guard rail 8 and the spacer iron 9 are fastened to each other with a semicircular square neck bolt 14, and a square hole is provided in the nut of the semicircular square neck bolt 14 and the nut at the other end. The washer plays the role of anti-rotation; a spring washer is arranged between the nut and the washer of the square hole to play the role of anti-loosening. The contact arc surfaces between the square hole washer and the rail 7 and between the...
Embodiment 3
[0036]Embodiment 3: the pillow body bolted elastic crossing of double protection plane laying (referring to Figure 4-6 , 9-12), and embodiment 1 and 2 difference is that a guard rail 8 is all housed in the inboard of two rails 7.
[0037] see Figure 5 and Figure 6 , the two guard rails 8 are all fixed on the under-rail buffer pad 5 above the crossing prestressed concrete sleeper 2 by another C-type boltless fastener 4, and the guard rail 8 and the rail 7 is provided with spacer iron 9, and with semicircle square neck bolt 14 this rail 7, guard rail 8 and spacer iron 9 are fastened mutually, in the nut of this semicircle square neck bolt 14 and the nut of the other end all set There is a washer with square and round holes to prevent rotation; a spring washer is arranged between the nut and the washer with square and round holes to prevent loosening. The contact arc surfaces between the square hole washer and the rail 7 and between the round hole washer and the guard rail ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com