Method and device for realizing user scheduling
A user scheduling and user technology, applied in the field of communication, can solve problems such as complex interference, system performance degradation, and user scheduling accuracy degradation, so as to achieve overall performance improvement, avoid system performance degradation, and improve accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] When the system adopts MU-MIMO technology and a maximum of N users can be scheduled on the same time-frequency resource, it is necessary to consider the current channel characteristics of the users and the principle of fairness when performing multi-user scheduling, and finally determine the resources to be scheduled on this resource. User. In general, firstly, the joint measurement value of two or more users paired should be multiplied by a reduction factor, and the reduction factors used for the joint measurement value after pairing different numbers of users can be the same or different; after that, use The reduced metric value replaces the original joint metric value as the final scheduling basis.
[0047] The value of the reduction factor is less than or equal to 1, which is related to the channel environment where the system is located. In a given channel scenario, adopting an appropriate reduction factor can make the average spectral efficiency and edge spectral...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 