A technology of column bearing platform beam and construction method, which is applied in the direction of construction, building structure, and building material processing, etc. It can solve the problems of difficult construction of foundation beam reinforcement, large beam cross-sectional size, and slow construction progress, so as to improve the strength And the overall stability, ensure the three-dimensional space position, the effect of fast construction progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0062] The present invention will be further described below in conjunction with specific examples.
[0063] A construction method for a steel pipe column cap beam joint of the present invention comprises the following steps:
[0064] First, see figure 1 , laying the floor cushion 1 and laying a waterproof layer on the floor cushion 1;
[0065] Then, the steel pipe column bottom plate 3 is installed in the platform foundation pit 2;
[0066] see figure 1 , figure 2 , the 3 steps of installing steel pipe column bottom plate include:
[0067] A plurality of anchor bolts 41 are pre-embedded on the manual excavation pile 4 in the foundation pit of the cap 2;
[0068] Put a steel pipe column bottom plate 3 with a plurality of anchor bolt holes 31 inside on the anchor bolt 41;
[0069] Adjust and fix the bottom plate 3 of the steel pipe column at an elevation position, fix the bottom plate 3 of the steel pipe column with nuts and gaskets, and weld the nuts and gaskets firmly;...