Aerobic composting method for organic perishable garbage
An aerobic composting and garbage technology, applied in the direction of organic fertilizer, organic fertilizer preparation, bio-organic part treatment, etc., can solve the problem of low digestion and utilization rate, and achieve the effect of easy promotion and application
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0022] A. Crushing and mixing
[0023] About 10 tons of perishable garbage per car is crushed within 3 hours until it can pass through a 1.2cm×1.2cm sieve, and then enters the aerobic fermentation bin, and adds EM from Guangzhou Yibang Biotechnology Co., Ltd. to the aerobic fermentation bin - For type 1 strains, mix well, adjust the carbon-nitrogen ratio of perishable waste to 25:1, and the moisture content to 50% by weight;
[0024] B. In piles
[0025] Take the mixed perishable garbage per two cars obtained in step A as a pile unit, and evenly distribute 4 forced ventilation pipes in the pile. The height of the pile is less than 2 meters, the bottom width is less than 5 meters, and the surface of the pile Cover with 10cm semi-clinker, the ventilation pipe is connected with the ventilation equipment, and a thermometer is installed in the pile;
[0026] C. The first maturity stage
[0027] The perishable garbage after step B is piled up is the first maturity period within 1...
Embodiment 2
[0037] The same as in Example 1, except that the perishable garbage in the step A is crushed for 5 hours, the carbon-nitrogen ratio is adjusted to 35:1, and the moisture content is 70% by weight; in the step B, 8 forced ventilation pipes are evenly distributed in the pile body, and the pile body The debugging is 1.5 meters, the bottom width is 4 meters, and the surface of the pile is covered with a 20cm sieve; the first decomposing period of step C is 15 days, and when the temperature of the pile reaches 65 degrees, it is extended to 40 minutes, and the moisture content of the pile is controlled to 60% Percentage by weight; step D turned over for the first time when heaped for 14 days, and adjusted the moisture content to 70% by weight; 20 days after the first turning of step E was the second maturity period, turning once every 3 days, and water replenishment control in the first 10 days The moisture content is 60%.
Embodiment 3
[0039] The same as in Example 1, except that the perishable garbage in the step A is crushed for 4 hours, the carbon-nitrogen ratio is adjusted to 30:1, and the water content is 60% by weight; in the step B, 6 forced ventilation pipes are evenly distributed in the pile body, and the pile body The debugging is 1 meter, the bottom width is 3 meters, and the surface of the pile is covered with a 15cm sieve; the first decomposing period of step C is 13 days, and the temperature of the pile is extended to 50 minutes when the temperature of the pile reaches 75 degrees, and the moisture content of the pile is controlled to 70%. Percentage by weight; D step turns the pile for the first time when it is piled up for 15 days, and adjusts the moisture content to 60% by weight; 17 days after the first turn of the E step is the second maturity period, turns once every 2 days, and controls water replenishment in the first 10 days The moisture content is 55%.
PUM
Property | Measurement | Unit |
---|---|---|
height | aaaaa | aaaaa |
width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com