Plane rotation construction technique for steel truss girder for existing bridge spanning construction

A construction technology and technology of steel truss girders, which are applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., which can solve the problems of large traffic interference on existing lines, large construction safety risks and hidden dangers, and inability to carry out normal construction.

Active Publication Date: 2014-08-06
NO 1 ENG LIMITED OF CR20G
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem to be solved by the present invention is to provide a steel truss girder planar swivel construction technology for bridge construction spanning existing lines in view of the above-mentioned deficiencies in the prior art. The construction process steps are simple, convenient construction, construction speed and construction process It is safe and reliable, with less interference to existing lines, and can effectively solve the problems of limited construction site and inability to carry out normal construction, large traffic interference to existing lines, construction safety risks and hidden dangers existing in the existing in-situ scaffolding method and dragging method. major issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Plane rotation construction technique for steel truss girder for existing bridge spanning construction
  • Plane rotation construction technique for steel truss girder for existing bridge spanning construction
  • Plane rotation construction technique for steel truss girder for existing bridge spanning construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0078] Such as figure 1 A steel truss girder planar swivel construction technique for bridge construction spanning existing lines is shown, comprising the following steps:

[0079] Step 1. Construction of steel truss girder high-level assembled platform: combined figure 2 and image 3 , erecting the steel truss girder high-level assembly platform for assembling the steel truss girder 6 .

[0080] Such as figure 1 The bridge constructed by the steel truss girder plane swivel construction process shown crosses the existing line 1 and obliquely intersects with the existing line 1. The existing line 1 is a double-track railway line, and the main girders of the constructed bridge are at the front and rear ends Steel truss girders 6 respectively supported on permanent pier 1 2 and permanent pier 2 3, see figure 2 The steel truss girder 6 is assembled from a plurality of steel truss girder segments, the permanent pier 2 and the permanent pier 2 3 are reinforced concrete piers, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a plane rotation construction technique for a steel truss girder for existing bridge spanning construction. A main girder of the constructed bridge is a steel truss girder spanning the existing bridge and obliquely crossing with the existing bridge; the technique comprises the following steps: firstly, constructing a high-altitude steel truss girder assembling platform which comprises a temporary buttress and a plurality of temporarily assembling brackets; secondly, assembling the steel truss girder at high altitude and removing the temporarily assembling brackets; thirdly, installing a steel truss girder rotation positioning device and a slippage system; before rotating the steel truss steel, firstly installing the steel truss girder rotation positioning device and the slippage system; fourthly, conducting plane rotation on the steel truss girder; and fifthly, dropping the girder in place. The construction technique is simple in steps, convenient to construct, fast to construct, safe and reliable in construction process and less in interference on the existing bridge, and can effectively solve the problems that the construction field is limited, the construction can not be normally conducted, the travelling interference on the existing bridge is large, the construction risk and hidden hazard are large and the like in construction with the existing in-situ falsework method and the dragging method.

Description

technical field [0001] The invention belongs to the technical field of bridge swivel construction, and in particular relates to a steel truss girder planar swivel construction technology for bridge construction across existing lines. Background technique [0002] Nowadays, there are many bridge construction projects spanning existing lines, and the bridges spanning existing lines include various types of bridges crossing existing railway operating lines and connecting road lines. Among them, for the construction of steel truss girders spanning existing lines, the actual construction of bridges on existing lines is not only complicated and difficult, but also likely to have a greater impact on the operation of the existing lines. At present, when constructing the steel truss girder spanning the existing line, the dragging method or the in-situ scaffolding method are usually used for erection. Among them, the dragging method refers to erecting a temporary support around the c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/08
Inventor 刘建新杜越张林唐培文张照龙严朝锋王永丽王刚张永鸿赵朝阳仲维玲朱红桃
Owner NO 1 ENG LIMITED OF CR20G
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products