Spray absorber for wet flue gas desulfurization
A technology of wet flue gas desulfurization and spray absorption tower, which is applied in the field of spray absorption tower, can solve the problems of low sulfur content and the difficulty of spray tower technology to meet environmental protection requirements, achieve high gas load and overcome easy crystallization And fouling, the effect that the operation elasticity is wide
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2015-03-25
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a spray absorption tower in wet flue gas desulfurization equipment, in particular to a wet flue gas desulfurization spray absorption tower. Background technique
[0002] The acid rain problem is one of the global environmental problems facing mankind today. The sulfur oxides SO produced by coal burning 2 and nitrogen oxides NO x Pollution is the main protozoa of acid rain in my country. Since my country's energy structure is dominated by coal, in my country's power industry, thermal power has always accounted for about 70% of the total power generation, and coal-fired power plants are the largest source of air pollution in my country. Controlling the flue gas pollution of power plants is the requirement to realize the coordinated development of economy, society and environment, and it is also the requirement to give full play to the advantages of my country's coal reserves and realize the sustainable development of coal-fired...
Examples
Embodiment Construction
[0018] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0019] The wet flue gas desulfurization spray absorption tower shown in the figure includes a spray tower cylinder body 8, and the lower and upper parts of the spray tower cylinder body 8 are respectively provided with a flue gas inlet channel 1 and a flue gas outlet channel 7, and the flue gas The junction between the upper part of the inlet passage 1 and the spray tower cylinder 8 is a chamfered or arc-shaped smooth transition structure, and the connection between the lower part of the flue gas inlet passage 1 and the spray tower cylinder 8 is 10-20° from the horizontal plane. Avoid crystallization or scaling here. Between the flue gas inlet channel 1 and the flue gas outlet channel 7, a slurry spray device 4 and a demister 5 are arranged horizontally from bottom to top, and a porous sieve plate is horizontally arranged between the ...