Car parking tower built on tower crane base
A technology of tower crane base and parking tower, which is applied to buildings, buildings, building types, etc. where cars are parked, can solve the problems of inconvenient car parking and waste of tower crane tower base resources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Embodiment 1: as Figure 1-6 As shown, a car parking tower built on the base of the tower crane is fixed with a parking tower on the base 7 of the tower crane. Parking tower entrance slope 13, tie rod 14, hoist; parking tower column 2 is partially inserted into tower crane base 7, parking tower column 2 and cable-stayed fixing rod 3 are welded to form a parking tower, and the bottom of the parking tower is welded with a parking tower base 5, The base is fixed on the tower crane base 7 by the welding column 6, and the bottom end of the parking tower column 2 is pre-laid with a reinforced concrete pier to form the elevator column cement base 12, and the parking tower column 2 inserted into the elevator column cement base 12 is connected with the The inclined column 11 and the tie rod 14 are welded to form the hoist column 10, the hoist is placed in the hoist column 10, the parking tower column 2 and the hoist column 10 form a complete parking tower, and the solar battery ...
Embodiment 2
[0037] Embodiment 2: as Figure 1-6 As shown, a car parking tower built on the base of the tower crane is fixed with a parking tower on the base 7 of the tower crane. Parking tower entrance slope 13, tie rod 14, hoist; parking tower column 2 is partially inserted into tower crane base 7, parking tower column 2 and cable-stayed fixing rod 3 are welded to form a parking tower, and the bottom of the parking tower is welded with a parking tower base 5, The base is fixed on the tower crane base 7 by nuts, and the bottom end of the parking tower column 2 is pre-laid with reinforced concrete piers to form the elevator column cement base 12, and the parking tower column 2 and the inclined column inserted in the elevator column cement base 12 11. The tie rod 14 is welded to form the hoist column 10, the hoist is placed in the hoist column 10, the parking tower column 2 and the hoist column 10 form a complete parking tower, the solar battery 1 is installed on the top of the parking towe...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


