Mechanical water plugging pipe column for multi-point discharge of cased hole completion multi-section fractured horizontal well and method

A horizontal well and mechanical technology, applied in casings, wellbore/well components, drilling pipes, etc., can solve the problems of water plugging failure, packer failure, short water plugging validity period, etc., to improve the validity period and avoid seal failure. Effect

Active Publication Date: 2012-12-05
PETROCHINA CO LTD
View PDF7 Cites 24 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Among them, the "fishable and drillable horizontal well water plugging process string" can only achieve two-stage sealing, that is, it can only be applied to the plugging of single-point water outlet, and cannot realize the plugging of multi-point water outlet; Annulus chemical packer material" is applied to screen completion horizontal wells; "51 / 2" casing perforation completion horizontal well mechanical layered composite pipe string for finding plugging water" is an integrated string for plugging detection, That is to say, the water plugging string is connected with the production string, and the peristalsis of the string during the production process will easily cause the failure of the packer, and the validity period of the water plugging will be short. At the same time, the pressure control switch is used, which will easily cause pressure confusion when pressing, and easily lead to the failure of the water plugging

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mechanical water plugging pipe column for multi-point discharge of cased hole completion multi-section fractured horizontal well and method
  • Mechanical water plugging pipe column for multi-point discharge of cased hole completion multi-section fractured horizontal well and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The details of the present invention can be understood more clearly with reference to the accompanying drawings and the description of specific embodiments of the present invention. However, the specific embodiments of the present invention described here are only for the purpose of explaining the present invention, and should not be construed as limiting the present invention in any way. Under the teaching of the present invention, the skilled person can conceive any possible modification based on the present invention, and these should be regarded as belonging to the scope of the present invention.

[0025] Please refer to figure 1 , is a structural schematic diagram of an embodiment of a mechanical water plugging pipe string for multi-stage fracturing horizontal well completion and multi-point water outlet of the present invention. Such as figure 1 As shown, the mechanical water plugging pipe string for multi-stage fracturing horizontal well multi-point water outle...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a mechanical plug pipe column for multi-point discharge of a cased hole completion multi-section fractured horizontal well and a water plugging method. The water plugging pipe column comprises a pipe plug and a Y445-type releasing packer, wherein at least three Y441-type packers are arranged between the pipe plug and the Y445-type releasing packer at intervals; sealed oil layer packing sections and water outlet layer packing sections are formed between two adjacent Y441-type packers and the inner wall of a horizontal well sleeve; a security joint and a control switch are orderly connected between the two Y441-type packers on each oil layer packing section through oil pipes in series; the security joint is serially connected between the two Y441-type packers on each water outlet layer packing section through the oil pipe; and the oil layer packing sections and the water outlet layer packing sections are connected in series through the oil pipes. According to the mechanical plug pipe column for multi-point discharge of the cased hole completion multi-section fractured horizontal well and the water plugging method, a plurality of Y441-type packers are adopted to be in multi-stage combination with the control switch, so that effective plugging of multi-point discharge of the multi-section fractured horizontal well or any point discharge is achieved; effective production of a major reservoir section is achieved, and the effects of controlling water and increasing oil are achieved.

Description

technical field [0001] The invention relates to a water plugging string and a water plugging method in the technical field of oil production in oil fields, in particular to a mechanical water plugging string and a water plugging method for multi-point water outlet of a multi-stage fracturing horizontal well with casing completion. Background technique [0002] In the field of petroleum exploitation, due to the complex and changeable wellbore trajectory of the horizontal well itself, the injection-production well pattern, and the different lithology, physical properties, and reservoir fluid properties of each oil layer, it is easy to cause multiple points of water production after the horizontal well is put into production, affecting Horizontal well development effect. In order to better exploit the development potential of horizontal wells, petroleum workers at home and abroad have carried out research on the water shutoff technology of horizontal wells; Water technology is...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21B17/00E21B33/12
Inventor 王百徐永高曾亚勤黄伟吕亿明甘庆明牛彩云赵春赵晓伟李大建朱洪征
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products