Construction method of reducing cast-in-place pile

A construction method and technology of cast-in-place piles, which are applied in sheet pile walls, foundation structure engineering, construction, etc., can solve problems such as obstacles to the popularization and use of variable-diameter cast-in-place piles, increased labor intensity, and increased engineering costs, and achieve low cost and economical Effects of labor and construction costs and simplification of construction steps

Active Publication Date: 2013-02-06
MCC COMM CONSTR GRP CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This construction method increases the labor intensity, increases the construction period, and increases the engineering cost, which hinders the popularization and use of variable-diameter cast-in-place piles.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of reducing cast-in-place pile
  • Construction method of reducing cast-in-place pile
  • Construction method of reducing cast-in-place pile

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] Embodiments of the construction method of variable-diameter cast-in-place piles according to the present invention will be described below with reference to the accompanying drawings. As those skilled in the art would realize, the described embodiments may be modified in various different ways, all without departing from the spirit and scope of the present invention. Accordingly, the drawings and description are illustrative in nature and not intended to limit the scope of the claims. In addition, in this specification, the same reference numerals denote the same or similar parts.

[0016] Figure 3a-3f It is the construction method of the variable-diameter cast-in-situ pile described in one embodiment of the present invention.

[0017] Such as Figure 3a As shown, the pile location is positioned according to the design requirements, and the drilling rig 1 is installed on the pile location so that the drilling rig 1 and the pile location are axially coincident.

[0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method of a reducing cast-in-place pile. The construction method of the reducing cast-in-place pile comprises the following steps: a), fixing a pile position, and fixing a boring machine; b), boring with the boring machine to a designed bore depth, moving the boring machine out of a pile bore, and moving a diameter reducer into the pile bore, wherein the diameter reducer comprises a grouting pipe, a pressure-resistant component is welded at the bottom end of the grouting pipe, and a force applying hammer is arranged on the outer side of the pipe wall of the grouting pipe in a sleeving manner; c), moving the pressure-resistant component to a position below a diameter-expanded section, pouring concrete into the pile bore through the grouting pipe, and stopping pouring when a concrete layer is 2-3 m above the pressure-resistant component; d), making the force applying hammer to do a motion of a free falling body repeatedly to repeatedly hammer the concrete layer till complete the diameter-expanded section; e), moving the diameter reducer to a position below another diameter-expanded section, repeating the step c) and the step d) till complete all diameter-expanded sections, and taking the diameter reducer out of the pile bore; and f), inserting a reinforcement cage into the pile bore, and solidifying and molding the concrete. By the construction method of the reducing cast-in-place pile, the diameter-expanded sections can be formed in the cast-in-place pile; and the construction process is simple.

Description

technical field [0001] The invention relates to the construction field, in particular to a construction method of variable-diameter cast-in-place piles. Background technique [0002] At present, cast-in-situ piles are more and more used in high-rise buildings and large structures. How to improve the bearing capacity of cast-in-situ piles is the biggest requirement for cast-in-situ pile construction. The bearing capacity of the pile is the result of the joint action of the resistance on the side of the pile and the resistance on the end face of the pile. Therefore, increasing the area of ​​the pile side and increasing the resistance per unit area on the side of the pile, or increasing the area at the end of the pile and increasing the resistance per unit area on the end surface of the pile can increase the bearing capacity of the pile. Such as figure 1 As shown, the traditional bored pile has the same cross-sectional area everywhere in the pile body and at the pile end. Su...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/48E02D5/36E02D15/04
Inventor 肖剑刘振辉
Owner MCC COMM CONSTR GRP CO LTD