Construction method of two-sidestep and four-step excavation support of weak large-span tunnel of mountain ridge

A construction method and tunnel excavation technology, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of frequent disturbances of surrounding rocks, long closure time of inverted arches, and difficulties in construction organization, etc., and achieve strong construction schedule guarantee, The effect of large construction space and stable progress

Active Publication Date: 2013-02-13
CHINA RAILWAY NO 5 ENG GRP
View PDF6 Cites 30 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a construction method for two-step four-step excavation and support of a soft and large-span tunnel in a mountainous area, so as to overcome the problems of many procedures, difficult construction organization, low work efficiency and slow construction progress in the prior art. High cost, many disturbances to the surrounding rock, large deformation of the surrounding rock and long closure time of the inverted arch, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of two-sidestep and four-step excavation support of weak large-span tunnel of mountain ridge
  • Construction method of two-sidestep and four-step excavation support of weak large-span tunnel of mountain ridge
  • Construction method of two-sidestep and four-step excavation support of weak large-span tunnel of mountain ridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The above-mentioned advance support means: before the excavation of the weak, soft-hard interlayer tunnel, the opening section adopts a Φ108mm large pipe shed for advance support, with a length of 15-30m, a circumferential distance of 40cm, and an external insertion angle of 2-3 degrees ; Note 1: 1 grout, grouting pressure 0.5 ~ 1MPa. The tunnel body is supported by Φ42mm small pipes (or Φ108mm large pipe sheds) in advance, with a length of 3.5-4m, a circular spacing of 30cm, a longitudinal lap length of not less than 1.0m, and an external insertion angle of 10-15 degrees. Liquid cement slurry (water: cement = 1:1 (weight ratio)); inject cement-water glass double liquid slurry in watery areas (A slurry: water: water glass = 8:1 (volume ratio); B slurry: water : Cement = 1:1 (weight ratio)), the modulus of water glass is 2.4~2.8, the concentration range of water glass is 30~45 degrees Baume, the volume ratio of cement and water glass paste is 1:1~1:0.3, The initial sett...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a two-sidestep and four-step excavation support of a weak large-span tunnel of a mountain ridge. The construction method comprises the steps of: performing advanced support at a tunnel opening section by adopting a big pipe shed with the diameter phi of 108 mm before tunnel excavation; performing advance support at the tunnel body section by adopting a small guide pipe with the diameter of phi 42 mm or a big pipe shed with the diameter of phi 108 mm; and excavating the tunnel, wherein the tunnel excavation is divided into an upper sidestep annular excavation and a lower sidestep left-right excavation; and the tunnel excavation specifically comprises four steps as follows: step 1, performing annular excavation and primary support on pre-remained core soil (2) of the upper sidestep; step 2, performing excavation and primary support on the core soil (2); step 3, performing excavation and primary support on the left side of the lower sidestep; and step 4, performing excavation and primary support on the right side of the lower sidestep. The construction method of the two-sidestep and four-step excavation support of the weak large-span tunnel of the mountain ridge, disclosed by the invention, has the advantages of solving disadvantages of multiple procedures, difficult construction and organization, low work efficiency, long sealing time of an inverted arch, great deformation of surrounding stones and the like in the prior art.

Description

technical field [0001] The invention relates to an excavation and support construction method for a large-span weak mountain tunnel, in particular to an excavation and support construction method for tunnels with soft and hard surrounding rocks interbedded with water (surrounding rocks of grade V and VI). Background technique [0002] Weak, soft and hard interbedded surrounding rock has the characteristics of low foundation bearing capacity, high water content, poor cohesive force, difficult excavation and easy collapse. When this type of tunnel is being built in my country, the surrounding rocks of grades V and VI mainly adopt the CRD method and the double side wall pilot pit method. Due to the limitation of the mountain environment, this type of construction method cannot well control the settlement deformation, and the block is small, There are many processes, all of which are manual or small-scale mechanical operations. Large-scale machinery cannot be deployed, and the cr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/01E21D11/00E21D11/10E21D11/38
Inventor 李永毅
Owner CHINA RAILWAY NO 5 ENG GRP
Features
  • Generate Ideas
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More