Method for tracking temperature of steel billet in heating furnace
A technology for heating furnaces and steel slabs, which is applied to heat treatment furnaces, furnaces, furnace types, etc., and can solve the problem that it is impossible to carry out multiple supporting experiments, affect the control effect of the heating furnace, and cannot reasonably realize the optimal control of the heating furnace and energy saving and consumption reduction Purpose and other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0219] A heating furnace includes: heating section one, heating section two, heating section three, and soaking section. The total length of the heating furnace is 43.2m. According to the method provided by the present invention, each furnace section itself is regarded as two calculation sections, that is, the number of calculation sections is M=8. The amount of fuel and air at the initial moment of each furnace section is shown in Table 1.
[0220] Table 1 Fuel volume and air volume at the initial moment of each furnace section
[0221] furnace section
heating for a period
Heating stage two
Heating three stages
soaking section
fuel volume (m 3 / h)
5630
6901
6001
9943
Air volume (m 3 / h)
7574
6745
6145
9812
[0222] The initial billet information is shown in Table 2.
[0223] Table 2 Billet initial information
[0224]
[0225] According to the method provided by the present invention, that...
Embodiment 2
[0229] A heating furnace includes: heating stage 1, heating stage 2, heating stage 3, and soaking stage. The total length of the heating furnace is 50.5m. According to the method provided by the present invention, one section of heating is divided into 2 calculation sections, the second section of heating is divided into 3 calculation sections, the third section of heating is divided into 3 calculation sections, and the soaking section is divided into 2 calculation sections. The furnace section itself is used as three calculation sections, that is, the number of calculation sections is M=10. The air-fuel ratio is 1.2, and the fuel quantity at the initial moment of each furnace section is shown in Table 4.
[0230] Table 4 The amount of fuel and air at the initial moment of each furnace section
[0231] furnace section
heating for a period
Heating stage two
Heating three stages
soaking section
fuel volume (m 3 / h)
14400
21060
19980...
PUM