Multifunctional arched combined prestress underground pipe gallery for cisty and preparation process thereof
A technology of underground pipe gallery and preparation process, which is applied to artificial islands, water conservancy projects, underwater structures, etc., to achieve the effect of enhancing shear resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] Below in conjunction with specific embodiment, the present invention will be discussed in detail:
[0040] as attached figure 1 As shown, the present invention includes a concrete arched pipe body 3 and a segment seat 1 and a segment 2 arranged at the lower part of the arched pipe body 3, and an outer layer skeleton 4 and an inner layer are arranged in the segment seat 1 and the segment 2 The frame 5, the outer frame 4 and the inner frame 5 are composed of steel bars 6 and longitudinal steel bars 7. A bobbin 9 is arranged on the inner or outer side of the outer frame 4 set in the segment 2, and the bobbin 9 is fixed with a reinforcing rib 8. On the inside or outside of the special-shaped steel bar 6, a longitudinal bobbin 10 is arranged between the bobbin 9 and the inner layer skeleton 5, and a steel strand 11 is arranged in the bobbin 9. The bobbins 9 arranged on both sides of the upper part of the segment 2 are anchored with anchors 12 after the prestress is generate...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com