Antiskid pile with hollow outer isosceles trapezoid cross section and in unequal interval arrangement
An isosceles trapezoid, anti-sliding pile technology, applied in excavation, sheet pile wall, foundation structure engineering, etc., can solve the problems of large amount of concrete pouring, high cost, large pile section, etc. Good effect and cost reduction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Example 1: An external isosceles trapezoid hollow cross-section anti-sliding pile 1 provided by the present invention, its structure is as follows figure 1 As shown, it is poured from reinforced concrete. The poured reinforced concrete anti-slide pile has an outer isosceles trapezoid hollow cross-section 4, and the shape of the hollow hole 2 in the cross-section is the same as that of the outer isosceles trapezoid.
[0029] The stress distribution on the cross section of the anti-sliding pile in the present invention is shown in figure 2 . One side of the longitudinal section of the long base of the outer isosceles trapezoid is used as the rear end 5 of the pile to receive the thrust 10 of the slope body. The rear end 5 of the pile is used as the arch foot of the soil arch behind the pile, and the slope thrust 10 received at both ends is relatively large and complex. One side of the longitudinal section of the short bottom side of the outer isosceles trapezoid is use...
Embodiment 2
[0033] Embodiment 2: Apply the anti-slide pile 1 with outer isosceles trapezoidal hollow cross-section provided in Embodiment 1 of the present invention to carry out construction with unequal spacing. Since the engineering quantity of each pile of the anti-slide pile in the present invention is not large, the influence on the stability of the landslide body during construction is small, and the construction section of the anti-slide pile is small, and the construction can be carried out by means of mechanical construction. The specific construction steps are as follows:
[0034] (1) Level the site, measure and locate the center point where the anti-slide piles are located according to the design drawings, and pay special attention to the fact that the anti-slide piles are not equidistant, that is, the distance between the anti-slide piles arranged near the main landslide section with large thrust of the landslide is small, and the distance between the two anti-slide piles is sm...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com