Method for erecting steel girder of cable-stayed bridge with diagonal main trusses

A technology for cable-stayed bridges and steel girders, which is applied in bridge construction, bridge erection/assembly bridges, etc. It can solve problems such as large mid-span deflection, difficulty in positioning and installing diagonal web bars, and heavy welding workload on the upper deck.

Active Publication Date: 2013-06-12
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
View PDF7 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problems to be solved by the present invention are the difficulty in spatial positioning and installation of diagonal web bars, the large mid-span deflection in the installation state of the cross-links, and the large welding workload of the upper bridge deck system.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for erecting steel girder of cable-stayed bridge with diagonal main trusses
  • Method for erecting steel girder of cable-stayed bridge with diagonal main trusses
  • Method for erecting steel girder of cable-stayed bridge with diagonal main trusses

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] Such as figure 1 , figure 2 As shown, the steel girder section of the inclined main truss cable-stayed bridge consists of diagonal webs 100 , lower chords 200 , lower deck systems 300 , vertical webs 400 , cross-links 500 , upper chords 600 and upper deck systems 700 . The upper chord spacing is greater than the lower chord spacing, and the upper bridge deck system 700 has a transverse width greater than its longitudinal length.

[0040] Below take the construction of the steel girder of the oblique main truss cable-stayed bridge erected by the cantilever of the girder crane as an example, in conjunction with the accompanying drawings of the description, the present invention is described in detail.

[0041] The steel girder erection method of the oblique main truss cable-stayed bridge provided by the present invention comprises the following steps:

[0042] A10, install the diagonal web pole 100, fix the lifting wire rope on the diagonal web pole 100, and guide chai...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for erecting a steel girder of a cable-stayed bridge with diagonal main trusses. The method comprises the following steps that A10, a diagonal web member is mounted, lifting steel wire ropes are fixedly arranged on the diagonal web member, leading chains are mounted on the lifting steel wire ropes, the diagonal angle and the twist angle of the diagonal web member are regulated through the leading chains after the diagonal web member is lifted to a position to be erected by utilizing a girder erection crane, and then the mounting of the diagonal web member is completed; A20, lower chords, a lower layer bridge deck system and vertical web members are lifted and mounted by utilizing the girder erection crane; A30, a sway bracing is mounted in an auxiliary manner by utilizing a movable type vertical support frame; A40, upper chords are mounted by utilizing the girder erection crane; and A50, an upper layer bridge deck system is lifted and mounted at twice in the longitudinal direction of the bridge. The method has the advantages of simplicity in operation and short construction period, and the problems of difficulty in space positioning and mounting of the diagonal web member, high middle span deflection of the mounting state of the sway bracing and large welding workload of the upper layer bridge deck system are solved.

Description

technical field [0001] The invention relates to bridge construction technology, in particular to a method for erecting steel girders of inclined main truss cable-stayed bridges. Background technique [0002] With the gradual increase in the construction of highway and railway dual-purpose bridges, the bridge shape of the inclined main truss cable-stayed bridge can better meet the requirements of unequal width of the bridge deck of highway and railway dual-purpose bridges due to its wide cross-section. The dosage is relatively low, and it is gradually widely used. At present, the Zhengzhou Yellow River highway-rail bridge that has been built in China is the first three-truss bridge in China that uses inclined main trusses. The steel girders are relatively small, and the steel girders are constructed using the jacking method, and the steel girders are assembled on the shore assembly platform using a gantry crane. [0003] Long-span steel truss girder cable-stayed bridges all...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00
Inventor 张爱花李军堂王东辉傅战工周明星张瑞霞姚发海代皓陈宁贤邓永锋
Owner CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More