Embodiment 1
[0040] An embodiment of the present invention provides a method for determining RB project parameters in a power system, figure 1 is the flowchart of the method, such as figure 1 As shown, the method includes:
[0041] Step 101, establishing the dynamic characteristics between the main parameters of the unit corresponding to the RB item according to the main parameter disturbance test;
[0042] Step 102, establishing a system simulation model corresponding to the RB project according to the actual working system;
[0043] Step 103, according to the dynamic characteristics between the main parameters of the unit, the RB project simulation test is carried out in the system simulation model;
[0044] Step 104, determine the RB item parameters according to the RB item simulation test results.
[0045] It can be seen from the above description that by first establishing the dynamic characteristics between the RB item and the main parameters, and then conducting the RB simulation t...
Embodiment 2
[0106] The embodiment of the present invention also provides a device for determining RB project parameters in a power system, such as Figure 12 As shown, the device includes:
[0107] The main parameter dynamic characteristics establishment unit 1 is used to establish the dynamic characteristics between the main parameters of the unit corresponding to the RB project according to the main parameter disturbance test;
[0108] The system simulation model building unit 2 is used to establish a system simulation model corresponding to the RB project according to the actual working system;
[0109] The simulation test execution unit 3 is used to perform the RB project simulation test in the system simulation model according to the dynamic characteristics between the main parameters of the unit;
[0110] The RB item parameter determination unit 4 is configured to determine the RB item parameters according to the RB item simulation test results.
[0111] It can be seen from the ab...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 