Production device and method for injection and production in the same well
A technology of injection-production and production methods in the same well, which is applied in the fields of production of fluids, earth-moving drilling and production, wellbore/well components, etc., can solve the problems of injection-production imbalance, production reduction, and impact on the production of adjacent wells, so as to reduce the cost of drilling wells. Quantity, cost savings, increased productivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0034] The embodiment of the present invention proposes a production device for injection and production in the same well, which includes a pipe string and casing 1, the pipe string is sleeved in the casing 1, and the casing 1 is respectively equipped with Corresponding to the oil production port 1a of the oil production section Y and the water injection port 1b corresponding to the water injection section S, an auxiliary pipe 2 is provided at the upper part between the pipe string and the casing 1 . The string includes concentric double pipes 3, a plurality of packers 4 and oil production channels. The upper end of the concentric double pipe 3 is connected to the upper oil pipe 6 through the Y-shaped joint 5, and the lower end of the concentric double pipe 3 is connected to the lower oil pipe 7. The position corresponding to the water injection section S on the concentric double pipe 3 is provided with a dispensing device 8. A plurality of packers 4 are connected between the...
Embodiment approach 2
[0040] figure 1 with figure 2 A schematic diagram showing the first and second embodiments of the present invention, figure 1 The string shown in can be referred to as the top injection type string, figure 2 The string shown in can be referred to as a mid-injection string. Such as figure 1 with figure 2 As shown, the lower end of the inner pipe 3a is connected to the lower oil pipe 7, and the lower end of the annular space between the inner and outer pipes 3a, 3b is closed.
[0041] Further, if figure 1 As shown, the oil production channel includes a through-hole 9 provided on the lower oil pipe 3b. In this embodiment, the oil-water mixture in the oil production section Y enters the lower oil pipe 7 through the oil production port 1 a and the through opening 9 , and then enters the inner pipe 3 a and the upper oil pipe 6 .
[0042] In addition, if figure 2 As shown, when there are many oil production sections Y, for example, when there are two oil production sectio...
Embodiment approach 3
[0048] A mining method for a production device for injection and production in the same well, said mining method comprising the steps of:
[0049] A. Set oil production section Y and water injection section S in the same well.
[0050] B. Water flows down from the secondary pipe 2 and enters the annular space between the inner and outer pipes 3a, 3b of the concentric double pipe 3.
[0051] C. When the water level in the annular space between the inner and outer pipes 3a, 3b reaches the position of the dispenser 8, the water flows out of the outer pipe 3b through the dispenser 8, and passes through the water injection port 1b Enter the water injection section S for water injection.
[0052] D. The oil-water mixture in the oil production section Y enters the inner pipe 3a and the upper oil pipe 6 in the pipe string through the oil production port 1a and the oil production channel, and is pumped out by the oil pump.
[0053] Wherein, when the well is an oil well, the ultra-hig...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 