Large complex underground life support pipeline system and supporting structure
A technology for life-sustaining pipelines and supporting structures, applied in underwater structures, infrastructure engineering, building types, etc., can solve the problems of long construction period, high project cost, scattered layout of life-sustaining pipelines, etc. Reduce cost and construction difficulty, and solve the effect of scattered layout
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0033] Such as figure 1 , figure 2 with image 3 As shown, it includes a large complex underground life-support pipeline system. 1) The underground life-support pipeline system is distributed in a large area on the plane, that is, distributed underground in the entire building. It is a multi-layer structure in space, and the diameter of the life-support pipeline is Not one, the diameter of the pipeline is 50-200mm; the buried depth of the life-support pipeline is 1-8 meters deep into the ground; The supporting structure includes a base plate 2, foundation piles 3 and a positioning support structure. The pipes of the underground life-support pipeline system are located in the space enclosed by the base plate 2, foundation piles 3 and the positioning support structure; the positioning support structure is a support plate structure or a hoisting structure. structure.
[0034] In this example:
[0035] The supporting plate structure can be formed by the pipeline supporting pl...
specific Embodiment 2
[0041] Such as Figure 4As shown, the characteristics of this embodiment are: the life-supporting pipeline 1 has two layers, the diameter of the upper-layer life-supporting pipeline 1-1 is greater than or equal to 400 mm, and the upper-layer life-supporting pipeline 1-1 can also pass through the first The hanging column 5-1 and the first pipeline support plate 4-1 are suspended under the bottom plate 2, the lower life support pipeline 1-3 is arranged on the pile cap 7 of the foundation pile 3 through the third pipeline support plate 4-3, and the upper layer The life-supporting pipeline 1-1 is arranged on the first pipeline supporting plate 4-1, the thickness of the first pipeline supporting plate 4-1 is 200 mm, and the first side beams are arranged at both ends of the lower part of the first pipeline supporting plate 4-1 8. The first pipeline supporting plate 4-1 is connected to the bottom plate 2 through a plurality of first suspenders 5-1 at both ends, and a first suspender ...
specific Embodiment 3
[0042] Such as Figure 5 , Image 6 , Figure 7 with Figure 8 As shown, the characteristics of this embodiment are: the life-supporting pipeline 1 has three layers, the upper-layer life-supporting pipeline 1-1 is arranged on the bottom plate 2 through hanging ribs 6, and the middle-level life-supporting pipeline 1-2 passes through the second hanging column 5- 2 and the second pipeline supporting plate 4-2 are suspended under the bottom plate 2, and the lower life support pipeline 1-3 is arranged on the pile cap 7 of the foundation pile 3 through the third pipeline supporting plate 4-3.
[0043] The diameters of the middle-level life-supporting pipeline 1-2 and the lower-level life-supporting pipeline 1-3 are greater than or equal to 400mm, and the middle-level life-supporting pipeline 1-2 is arranged on the second pipeline supporting plate 4-2, and the second pipeline supporting plate The thickness is 200mm, and the two ends of the lower part of the second pipeline support...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 