Static blasting construction method for highway tunnel

A technology of static blasting and road tunnels, applied in blasting and other directions, can solve the problems of increased construction cost, poor construction safety, and low rock-breaking ability, and achieve the effects of reducing engineering cost, safe and reliable construction, and strong rock-breaking ability

Inactive Publication Date: 2013-08-07
INST OF ROCK AND SOIL MECHANICS - CHINESE ACAD OF SCI +2
View PDF4 Cites 48 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the development of my country's transportation construction, more and more road lines are closely intersecting and passing through existing traffic projects and residential buildings. Some road tunnels are close to cities and densely populated areas. The use of conventional drilling and blasting technology will seriously threaten The safety of adjacent buildings affects the production and life of residents
For example, the exit end of the Longxiang Tunnel of the newly-built Dali Expressway is a densely populated area with many civil buildings, and the tunnel crosses the railway tunnel below at close distance, and the entrance is on an unstable slope. In order to ensure the safety of the surrounding buildings and the slope of the entrance, The tunnel design cannot be excavated by the conventional drilling and blasting method. Therefore, the excavation machine and manual excavation are used in the tunnel, and the progress is very slow. When encountering hard boulders or large hard sandstones, the digging will not work, resulting in construction stagnation. The footage is only 18m, which seriously affects the construction period and increases the construction cost
The current static blasting technology for tunnels generally has problems such as low rock-breaking ability, poor construction safety, low efficiency, and inability to meet the requirements of engineering construction.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Static blasting construction method for highway tunnel
  • Static blasting construction method for highway tunnel
  • Static blasting construction method for highway tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0039] Below in conjunction with a specific construction case of a tunnel and accompanying drawing, the present invention is described in further detail:

[0040] A static blasting construction method for high ground stress soft rock road tunnels, the steps of which are:

[0041] 1. Formulate tunnel excavation methods:

[0042] Tunnel cavity type and support type such as figure 1 , figure 2 Shown (1 is the primary lining of the tunnel, 2 is the secondary lining of the tunnel).

[0043] Different tunnel excavation methods are adopted according to the type of surrounding rock. When the surrounding rock is grade V (the classification of surrounding rock is based on "Code for Design of Highway Tunnels JTG D70-2004"), the three-step method (see figure 1 ) excavation, the heights of upper bench 3, middle bench 4, and lower bench 5 are respectively 3.5m, 3.5m, and 5.0m, and the footage per cycle is 1.5m. In order to speed up the construction progress, it is advisable to arrange...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a static blasting construction method for a high-ground-stress soft-rock highway tunnel. The method comprises the steps of establishing of a tunnel excavation mode: a three-step method is used for excavation when surrounding rock is at the V level, and an upper and down step method is used for excavation when the surrounding rock is at the IV and III levels; cut hole construction: a diamond cutting mode and a wedge cutting mode are used for cutting holes according to different levels of the surrounding rock; rock breaking through splitting of a hydraulic splitter to form an excavation free face: the hydraulic rock splitter is used for splitting rock along a cut hole after construction of the cut hole to form the excavation free face for the next step; construction of an auxiliary hole and periphery holes of an upper step; construction of an auxiliary hole and periphery holes of a lower (middle) step; static blasting and de-slagging and hole periphery trimming; and circulation operation. According to the static blasting construction method, the rock breaking capacity and the rock breaking efficiency are high, high adaptability is provided for different surrounding rock, the technology can be implemented easily, the construction is safe and reliable, and the method is particularly applicable to highway tunnels with special construction requirements.

Description

technical field [0001] The invention relates to the technical field of road tunnel construction, and more particularly relates to a static blasting construction method for a road tunnel. Background technique [0002] With the development of my country's transportation construction, more and more road lines are closely intersecting and passing through existing traffic projects and residential buildings. Some road tunnels are close to cities and densely populated areas. The use of conventional drilling and blasting technology will seriously threaten The safety of adjacent buildings will affect the production and life of residents. For example, the exit end of the Longxiang Tunnel of the newly-built Dali Expressway is a densely populated area with many civil buildings, and the tunnel crosses the railway tunnel below at close distance, and the entrance is on an unstable slope. In order to ensure the safety of the surrounding buildings and the slope of the entrance, The tunnel de...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): F42D1/00F42D3/00
Inventor 汤华孙乔宝唐平祥赵栋琪李怀珍赵灿元戴永浩吴振君杜江梅
Owner INST OF ROCK AND SOIL MECHANICS - CHINESE ACAD OF SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products