Sealing method of grouting layer at the connection between upper and lower floors of prefabricated shear wall buildings
A shear wall, prefabricated technology, applied in the processing of building materials, construction, building structure, etc., can solve the problem that the vertical load cannot be guaranteed to be transmitted smoothly on the upper and lower floors, the flatness of the grouting layer 4 cannot be guaranteed, and the grouting layer 4 cannot be guaranteed. Strength and other issues, to achieve the effect of saving materials, good impact resistance, and convenient prefabrication
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0022] First fix the wooden strips 11 on both sides of the grouting layer 4 with steel nails 12 to completely block the two sides of the grouting layer 4, and then fill the high-strength grouting material 5 and the grouting layer 4 until the high-strength grouting material 5 is completely solidified to reach a certain strength Finally, dismantle and reclaim wooden bar 11. The present invention uses wooden strips 11 as the lateral plugging material of the grouting layer 4 to ensure the flatness of one side of the grouting layer 4, to ensure that the high-strength grouting material 5 completely fills the grouting layer 4, and completely transmits the load between the upper and lower layers. During application, the wood type of the wooden strip 11, the cross-sectional size of the wooden strip 11, the material of the steel nail 12, and the size of the steel nail 12 are determined according to the actual stress situation of the project, such as Figure 3 ~ Figure 4 shown. The ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 