Unlock instant, AI-driven research and patent intelligence for your innovation.

Electric mold lifting construction method of chimney

A construction method and chimney technology, applied in the direction of formwork/formwork/work frame, building type, preparation of building components on site, etc., can solve the problems of labor cost, a large amount of racking materials, and the inability to install climbing boots, etc., and achieve saving The effect of manpower, reduction of construction period and construction cost, reduction of operational risk and construction difficulty

Active Publication Date: 2015-02-11
中国能源建设集团广东电力工程局有限公司
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] And as figure 1 As shown, according to the characteristics of the electric formwork lifting construction technology, when the chimney wall is constructed in sections, it is necessary to reserve a wall screw hole 101 on the wall 100 of every 1.5m saved (see figure 1 ), used to fix the climbing boots as the climbing fulcrum of the electric mold lifting device, however, due to the part of the bottom of the chimney wall (about 0-50 meters above the ground), there are reserved openings such as installation holes, door openings, and flue openings , the reserved hole occupies a large area of ​​the side wall of the chimney in this area, especially the flue opening occupies about one-third of the area of ​​the side wall of the chimney in this area, resulting in a large number of climbing boots that cannot be installed, and the wall below the flue opening cannot be installed The electric mold lifting device is used for electric mold lifting construction. Therefore, in the past construction, the wall below the flue mouth can only be erected by scaffolding, and the construction is carried out according to the conventional mold turning method. 200 to set up a full hall of scaffolding, and 300 to erect double-row scaffolding on the outer side of the tube wall. After the construction of the tube wall corresponding to the flue opening is completed, the electric mold lifting device is assembled in the area above the flue opening, and then the area above the flue opening is electrically lifted. Construction, but the assembly height at this time is generally above 30 meters, which has the following disadvantages: 1. It requires a lot of bending materials, and at the same time, it takes a lot of labor to install and disassemble the bending; 2. The assembly position is high (generally above 30 meters) , the operation risk is high, and the construction is difficult; 3. It is necessary to use a crane with a lifting weight of more than 100 tons for hoisting, and this crane is difficult to rent and expensive; 4. The construction period is long

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric mold lifting construction method of chimney
  • Electric mold lifting construction method of chimney
  • Electric mold lifting construction method of chimney

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] A kind of chimney electric formwork lifting construction method of the present invention, comprises the following steps: A, according to conventional formwork turning construction technology, carry out construction to chimney tube wall 1 below 6 meters and reserve the wall-through screw hole that climbing boot is installed At the same time, according to the load of the electric mold lifting device, the position and size of the chimney opening, multiple rows of horizontal pre-insertion rods 2 and vertical pre-insertion rods 3 are pre-inserted on the two side walls 12 and the bottom wall 13 of the chimney opening 11 respectively ( Such as Figure 4 , Figure 5 As shown, it is the case of pre-inserting two rows of horizontal pre-insertion rods 2 and vertical pre-insertion rods 3 respectively on the two side walls 12 and bottom wall 13 of the chimney opening 11); B, corresponding to the chimney wall 1 on the ground Position assembly electric mold lifting device 8; C, betwe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an electric mold lifting construction method of a chimney. The method includes: bents formed by circumferential rods and vertical rods are fixedly connected onto horizontal pre-inserted rods and vertical pre-inserted rods on two side walls and the bottom wall of a tunnel opening, lead screw through pipes are fixed on the bents so as to enable climbing boots to be capable of being installed at the position of the tunnel opening, so that an electric mold lifting device can also be assembled on a bottom portion with the tunnel opening of the chimney cylinder wall, and electric mold lifting construction can be performed on the portion of the bottom of the chimney corresponding to the tunnel opening. While in the prior art, the electric mold lifting device can only be assembled at a high-altitude position about 30 meters away from the ground above the tunnel opening. Therefore, the electric mold lifting construction method of the chimney does not need to use a large amount of bents and a crane with hoisting weight larger than 100 tons for hoisting, can save a lot of manual work, lowers operation risks and construction difficulty, and reduces construction period and construction cost.

Description

technical field [0001] The invention relates to a construction method for electric formwork lifting construction at the bottom of a chimney. Background technique [0002] The chimney tube wall electric formwork lifting construction technology is a relatively advanced chimney construction technology in chimney construction at present. During the construction process, the climbing boots fixed on the poured concrete tube wall (the climbing boots are fixed on the tube wall anchor bolts) are used as the The fulcrum, driven by the electric cycloid reducer, gradually drives the electric mold lifting device attached to the wall of the chimney to rise gradually with the increase of the chimney construction height, so that the operation installed on it can be realized through the electric mold lifting device Vertical movement of the frame until the whole system rises to the design height of the chimney. [0003] And as figure 1 As shown, according to the characteristics of the elect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04H12/28E04G11/22
Inventor 张远戴本铿陈清王伟明张庆勇洪保才吴鑫盛汤嘉旭刘厚剑
Owner 中国能源建设集团广东电力工程局有限公司