Oil and gas reservoir numerical simulation calculation method
A technology of numerical simulation and calculation method, applied in the direction of calculation, electrical digital data processing, special data processing application, etc., can solve the problems of non-convergence of calculation, poor calculation stability, long calculation time, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] This embodiment provides a numerical simulation calculation method for oil and gas reservoirs, such as figure 1 As shown, the method includes:
[0023] Step S101, solving the oil phase pressure, water phase pressure, and gas phase pressure at each moment of the simulation process after the spatial discretization.
[0024] This step is divided into the following four processes:
[0025] Process 1, establishing the pressure equation in the linear difference equation, that is, according to the existing IMPES method, the conventional linear difference equations are eliminated and simplified, and the water saturation difference δS after the spatial discretization is eliminated w and gas saturation difference δS g After that, the oil-phase pressure difference δp after only including the variable space discretization is obtained o the equation;
[0026] Among them, δS w = S w n+1 -S w n ;S w n+1 , S w n are the water saturation at the n+1th moment and the nth mome...
Embodiment 2
[0067] This example takes the calculation process of a polymer-microgel flooding numerical simulation software (hereinafter referred to as POLY software) as an example to introduce in detail the application of the oil and gas reservoir numerical simulation calculation method provided in Example 1. The POLY software is based on the example 1. The numerical simulation calculation method of the oil and gas reservoir provided is the calculation principle.
[0068] Such as figure 2 As shown, the calculation process of POLY software is as follows:
[0069] Step S201, the program is started, and the memory environment required for program operation is established;
[0070] Step S202, input the number of grids in different directions, the width, thickness, permeability, and porosity data of each grid required for numerical simulation;
[0071] Step S203, input the oil-gas-water viscosity, dissolved gas-oil ratio, volume coefficient, and phase permeability parameters required for nu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com