Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method of synchronous grouting process for ground in-out shield-driven tunnel

A technology of synchronous grouting and construction methods, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as ground breakdown, lack of fluidity, and easy grouting on the ground, and achieve high early strength and good flow filling Performance, the effect of controlling construction quality

Active Publication Date: 2015-04-01
SHANGHAI TUNNEL ENG CO LTD +2
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0013] 1) The grout flow and filling performance in conventional synchronous grouting construction is poor. Under the construction conditions of the ground access shield tunneling method (the surrounding soil confining pressure is small), the grout material does not have the flow to fully fill the building void. sex;
[0014] 2) The construction parameters (grouting volume and grouting pressure) in the conventional synchronous grouting process are all calculated by considering the surrounding confining pressure, and the setting range of parameter values ​​is relatively large, while the ground access shield tunneling If the amount of grouting or the grouting pressure is too large, the ground will be prone to grout or the grout will penetrate the ground and the surface will bulge; if the amount of grouting or the grouting pressure is too small, the building void will not be fully filled, resulting in a stable tunnel. Poor performance and subsidence of the surrounding ground

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of synchronous grouting process for ground in-out shield-driven tunnel
  • Construction method of synchronous grouting process for ground in-out shield-driven tunnel
  • Construction method of synchronous grouting process for ground in-out shield-driven tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0064] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0065] The present invention is implemented by following technical scheme:

[0066] 1. Configuration of slurry material

[0067] The mixing ratio and performance index control of slurry materials shall be carried out in accordance with the following Table 1 and Table 2:

[0068] Table 1 Synchronous grouting material mix ratio

[0069]

[0070] Table 2 Synchronous grouting material performance index

[0071]

[0072] 2. Production and construction of slurry materials

[0073] The grout mate...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method of a synchronous grouting process for a ground in-out shield-driven tunnel. The construction method comprises the following steps: 1, producing grout; 2, confirming synchronous grouting construction parameters according to working conditions, wherein the synchronous grouting construction parameters are injecting rate, proportional distribution of the upper part and the lower part, and grouting pressure control; 3, carrying out construction according to the synchronous grouting construction parameters. The construction method has the benefits that 1, in the aspect of performance index, a grout material can perform better flowing and filling performances than a conventional grout material; 2, in the aspect of performance index, the grout material has higher early strength than the conventional grout material; 3, the construction parameters are obtained according to different working conditions of a ground in-out shield-driven tunnel, so that construction quality can be controlled effectively.

Description

technical field [0001] The invention relates to a synchronous grouting process for tunnels, in particular to a construction method for the synchronous grouting process for tunnels with a ground access type shield tunneling method. Background technique [0002] The shield construction method has become the first choice for urban tunnel construction methods due to its advantages such as small impact on the surrounding environment, high forming quality, safety and reliability, fast construction progress, and low cost. The synchronous grouting technology in shield tunneling construction is an indispensable key auxiliary construction method in shield tunneling construction method, and it is the key to control ground settlement and tunnel stability. The synchronous grouting process of shield tunneling is to inject grout with certain working performance and strength into the outer gap of the segment ring at the tail of the shield through the grouting pump while the shield is excava...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/10E21D9/06
Inventor 周文波黄俊张冠军吴惠明郑宜枫滕丽李刚林家祥卓发成张亮李永巴雅吉乎
Owner SHANGHAI TUNNEL ENG CO LTD