Automatic electricity meter turnover box loading system
A technology of electric energy meter and turnover box, which is used in transportation and packaging, loading/unloading, stacking of objects, etc., can solve the problems of low efficiency and high loading intensity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] figure 1 The structure diagram of the automatic loading system of the electric energy meter of the present invention is given. The structure of the electric energy meter automatic loading system consists of five parts: a vertical two-way transplanting platform, an operating platform, a horizontal adjustment device, a loading machine and a jacking device. The vertical two-way transplanting platform is designed to connect with the conveyor line and receive the electric energy meter of the conveyor line. Panasonic FP-X C30T PLC controls two 750W Panasonic servo motors to control the up and down movement of the receiving platform and two 200W Panasonic servos The motor controls the horizontal operation of the receiving platform, and the lateral movement of the vertical two-way transplanting platform is controlled by a hydraulic cylinder. The operation platform is a platform designed to realize the alignment of the automatic loading system of the electric energy meter with ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com