Wind power plant simulation testing platform and testing method thereof

A technology of simulation testing and testing methods, which is applied in the field of wind power, can solve problems such as commissioning costs and high operating risks, and achieve the effects of reducing upgrade maintenance costs, hardware costs, cycle times and costs

Inactive Publication Date: 2014-02-05
CRRC WIND POWER(SHANDONG) CO LTD
View PDF8 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

After the general system development is completed, it needs to be tested for its functionality and reliability. However, there is currently no test platform for the wind farm management system. Most of the software is directly installed and operated in the real wind farm after model verification. The development and debugging costs of the system and High risk of operation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Wind power plant simulation testing platform and testing method thereof
  • Wind power plant simulation testing platform and testing method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] In order to conduct research and development tests on the wind farm management system and improve its development process and test evaluation system, the present invention provides a wind farm simulation test platform and a test method thereof. Management system prototype. The host computer is used to set and monitor the entire testing process, the wind farm simulator is used to simulate the operating state of the entire wind farm, the wind farm management system prototype is used to quickly implement the real wind farm management system to be tested, and the wind farm simulation The prototype machine and the wind farm management system are connected in a hardware-in-the-loop manner, which can be flexibly configured and expanded according to the characteristics of the system to be tested. The wind farm simulation test platform and the test method can realize the comprehensive test and comprehensive evaluation of the wind farm management system.

[0022] like figure 1 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a wind power plant simulation testing platform and a testing method thereof. The platform comprises an upper computer, a wind power plant simulation machine and a wind power plant managing system prototype machine which are connected in a communication mode. The upper computer is used for setting and monitoring the whole testing process, the wind power plant simulation machine is used for simulating the operation state of a whole wind power plant, the wind power plant managing system prototype machine is used for fast achieving a true wind power plant managing system to be tested. The testing method comprises the steps of establishing a wind power plant model, configuring the wind power plant simulation machine and the wind power plant managing system prototype machine, setting a testing working condition and a model parameter, monitoring the testing process, processing the testing result and carrying out the analysis and evaluation. The wind power plant simulation testing platform and the testing method have the advantages that the research, development and test on software and hardware of the wind power plant managing system can be achieved in a laboratory, the development cycle of the system is shorted, the development cost of the system is reduced, the spot working conditions such as faults and the extreme working conditions can be reproduced, and the later upgrading and maintaining cost is reduced.

Description

technical field [0001] The invention belongs to the technical field of wind power, in particular to a wind farm simulation test platform and a test method for a wind farm management system. Background technique [0002] At present, wind power generation is considered to be one of the main ways to solve the current world energy, environmental and financial crisis. my country is rich in wind energy resources. In recent years, the wind power industry has maintained rapid development. Since 2011, my country's new and cumulative installed capacity has remained world number one. Due to the intermittent and fluctuating characteristics of wind energy, large-scale wind power grid integration has a greater impact on the power grid. Active power fluctuations affect the frequency of the power grid, and reactive power fluctuations affect the voltage of the power grid. Restricted by my country's power grid transmission capacity and wind farm regulation capacity, the phenomenon of "wind a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G05B17/02
CPCG05B17/02F03D11/00F03D17/00F05B2260/83F05B2260/84
Inventor 鲁效平吴树梁赵磊张海华于良峰崔冬明
Owner CRRC WIND POWER(SHANDONG) CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products