[0014] A groundwater drainage pipe (4) is placed in the underground trench at the bottom of the pool to collect the liquid drained by the plastic permeable blind trenches (3) at the bottom and slopes of the pool, and the plastic permeable blind trenches (3) form the groundwater drainage of the liquid storage pool. row system.
[0015] After 50cm of compacted clay is set on the groundwater drainage system on the geotechnical base surface, a plastic permeable blind ditch (3), a geotextile (2) and an HDPE geomembrane (1) are laid. An interval of 1m to 3m is set between the plastic permeable blind ditches (3), which can be laid to the top of the slope (7) and fixed with anchoring nails.
[0016] Air holes (5) with a diameter of 10 cm are opened on the HDPE geomembrane (1) on each side of the pool wall, and the plastic water-permeable blind ditch (3) constitutes a gas channel under the membrane for discharging gas under the membrane. The edge of the air hole (5) is at least 20cm a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com