Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Three-phase kilowatt-hour meter false wiring automatic conversion method

A three-phase electric energy meter, wrong wiring technology, applied in the field of conversion, can solve problems such as being difficult to correct, affecting the normal operation of the power system, wrong wiring of the three-phase electric energy meter, etc., to achieve the effects of convenient use, elimination of electric energy measurement errors, and simple structure

Inactive Publication Date: 2014-04-16
CHENGDU TIANXING ELECTRIC
View PDF6 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide an automatic conversion method for wrong wiring of a three-phase electric energy meter, which mainly solves the problem in the prior art that the three-phase electric energy meter is prone to wiring errors and is not easy to correct, which will affect the normal operation of the power system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Three-phase kilowatt-hour meter false wiring automatic conversion method
  • Three-phase kilowatt-hour meter false wiring automatic conversion method
  • Three-phase kilowatt-hour meter false wiring automatic conversion method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0025] In order to solve the problem that the three-phase electric energy meter in the prior art is prone to wiring errors and is not easy to correct, which will affect the normal operation of the power system. Such as figure 1 As shown, the invention discloses an automatic conversion method for wrong wiring of a three-phase electric energy meter, which includes a three-phase current conversion module, a three-phase voltage conversion module, a digital phase-shift multiplier and a digital signal processor.

[0026] Among them, the three-phase current conversion module and the three-phase voltage conversion module are connected to the digital phase-shift multiplier, and the digital phase-shift multiplier is connected to the digital signal processor, and a memory chip (such as a RAM chip) is integrated in the digital signal processor , ROM chip) and two A / D conversion chips.

[0027] When in use, the digital signal processor receives the current three-phase voltage and three-ph...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a three-phase kilowatt-hour meter false wiring automatic conversion method, aiming at solving the problems of a three-phase kilowatt-hour meter of the prior art that wiring error easily occurs and is difficult to correct, so as to cause influence on normal operation of an electric system. The three-phase kilowatt-hour meter false wiring automatic conversion method comprises the steps of receiving current three-phase voltage and three-phase current through a digital signal processor, and calculating current active power, reactive power and power factor; judging current three-phase working quadrant through the digital signal processor depending on the calculated power and power factor, and judging that whether three-phase wiring is correct or not depending on current three-phase working quadrant; if the wiring is right, continuing operation; and if the wiring is wrong, controlling a digital phase shift multiplier to implement conversion through the digital signal processor. Through the solution, the method disclosed by the invention can achieve a purpose of automatically correcting a wiring error, and has quite high practical value and promotional value.

Description

technical field [0001] The invention relates to a switching method, in particular to an automatic switching method for wrong wiring of a three-phase electric energy meter. Background technique [0002] As we all know, the measurement of the three-phase electric energy meter is the basis for the power supply department to collect electricity charges, and it plays a very important role in the work of the power supply system. However, in the actual implementation process, the three-phase electric energy meter is prone to various wiring errors. If it is not corrected in time It will cause measurement errors and then cause charging errors, which will bring a lot of inconvenience to the power management department and users. [0003] At present, the wrong wiring of the three-phase electric energy meter in China is still limited to how to identify whether it is wrong wiring, and manually correct it when it is judged to be wrong wiring. At the same time, the power department needs t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01R11/00G01R31/02
Inventor 黄茂彪杨衡
Owner CHENGDU TIANXING ELECTRIC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products