Production method for bored pile
The technology of a bored cast-in-place pile and a manufacturing method, which is applied in the field of pile foundations, can solve the problems of pile size limitation, insufficient bearing capacity of a single pile, inability to meet support requirements, etc., and achieve the effect of improving bearing capacity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0008] Preferred embodiments of the present invention are described below, and it should be understood that the preferred embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.
[0009] The invention discloses a method for making bored piles. The size of the pile is determined according to the requirements of the bearing capacity, and then holes are drilled at the pile positions according to the size of the piles, and then concrete is poured into the holes to solidify into piles. This kind of pile can freely change the length and diameter of the pile according to the design requirements, so as to realize the increase of the bearing capacity of the single pile.
[0010] After the drilling is completed, a reinforcement cage can be placed in the hole and then poured with concrete. Putting in a reinforcement cage can increase the firmness of the pile and increase the bearing capacity of the sin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More