A kind of smw engineering method section steel pulling out grouting method
A type of steel and grouting technology, applied in infrastructure engineering, construction, sheet pile walls, etc., can solve problems such as gap blocking, achieve cost control, ensure dense filling, and achieve the effect of simultaneity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] Below in conjunction with specific embodiment, further illustrate the present invention. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art may make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.
[0030] The embodiment of the present invention relates to a method for removing and grouting SMW section steel, which includes the following steps: welding steel pipes on the outside of the section steel web, the welding position is close to the center of the section steel web and avoids the hoisting holes on the section steel web; At the same time, it is lowered to the cement-soil mixing pile that has been stirred to comp...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 