Method for Automatic Fault Judgment and Control of Distribution Network Powered by Full Circuit Breaker Ring Main Unit
A technology for automatic judgment of power distribution network faults. It is applied to fault locations, electrical components, emergency protection circuit devices, etc. It can solve the problems of different switchgear, large construction cost and complexity, and achieve the effect of moderate investment cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Assume that the distribution cable network is: small resistance grounding method, the substation outlet circuit breakers CB1 and CB2 are configured with a definite time limit phase overcurrent protection delay: 0.3 seconds, a definite time limit zero sequence overcurrent protection delay time: 1.0 seconds, a reclosing delay Time: 5 seconds. At this time, the ring network cabinet needs to be equipped with three-phase current transformers, zero-sequence current transformers, and incoming and outgoing line voltage transformers; the distribution automation terminal switch room is equipped with a unified definite time limit phase overcurrent protection delay: 0.15 seconds, definite time zero sequence Delay of over-current protection: 0.5 seconds; configured with a unified fault outgoing line switch tripping outside the area, branch line fault branch line switch tripping, no fault incoming line switch tripping with a delay of 2 seconds for voltage loss, and closing for 5 secon...
Embodiment 2
[0034]Assuming that the distribution cable network is: ungrounded or arc-suppression coil grounded, substation outlet circuit breakers CB1 and CB2 are configured with a definite phase overcurrent protection delay of 0.3 seconds, and a reclosing delay of 5 seconds. At this time, the ring network cabinet needs to be equipped with three-phase current transformers, zero-sequence current transformers, zero-sequence voltage transformers, and incoming and outgoing line voltage transformers; the power distribution automation terminal switch room is equipped with a unified definite time limit phase overcurrent protection delay: 0.15 Seconds, zero-sequence power direction to judge single-phase grounding fault function; configure a unified fault outgoing line switch trip outside the area, branch line fault branch line switch trip, no fault incoming line switch trip after 2 seconds of voltage loss, and close after 5 seconds when one side has voltage delay. One side of the contact switch lo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com