Dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system

A technology of redundant control, measurement and control equipment, applied in general control systems, control/regulation systems, instruments, etc., can solve the needs of difficult to meet the "zero window" launch mission, poor combination and interchangeability of control modules, replacement of spare parts Long time and other problems, to achieve the effect of improving rapid response capability, improving reliability, and simple structure

Active Publication Date: 2014-09-10
BEIJING INST OF SPACE LAUNCH TECH +1
View PDF5 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The pre-power measurement and control equipment is the supporting equipment for the power measurement and control system of the rocket launch site. Focus on all the control work in the stage, so the power front-end measurement and control equipment is required to have high reliability. If there is a failure in the pre-shooting process stage, it has the ability to quickly replace the response. The previous supporting front-end control equipment has shortcomings in the actual use process: First, the degree of integration is low, and the combination and interchangeability of each control module are poor, resulting in complicated cabinet configuration and state transition, and a long time to replace spare parts; second, all control signals are controlled by unit devices. , it is difficult to meet the requirements of the "zero window" launch mission

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system
  • Dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system
  • Dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The present invention is described in detail below with reference to accompanying drawing and embodiment:

[0029] attached Figure 1-12 It can be seen that a modular redundant control system for the power relay cabinet of power pre-measurement and control equipment includes a power supply control module, a ground core primary gas distribution platform control module, a ground core secondary gas distribution platform control module, a rocket engine valve control module, The wired measurement parameter acquisition and display module; the power supply module adopts the redundant control of master and slave power supply; the control signal of the power relay cabinet adopts the redundant control of synchronous power-on of dual components.

[0030] The power supply control module is composed of at least 6 high-power relay control modules and medium-power relay control modules, a transient suppression and redundancy test circuit module and a signal display module.

[0031] T...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system is provided. The dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system includes a power source control module, a ground core one-stage gas distribution station control module, a ground core two-stage gas distribution station control module, a rocket engine valve control module and a wired measurement parameter acquisition display module; according to the power source module, master and slave power source hot standby redundancy control is adopted; and according to control signals of a dynamic relay cabinet, redundancy control of double-component synchronous electrification is adopted. According to the dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system of the invention, a small number of functional modules are adopted to form control units as much as possible, and therefore, the dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system is stable in performance and simple in structure; the modules are provided with standard interfaces, the combination of different functional modules and the interchange of identical functional modules can be ensured, and therefore, supporting facilities of an overall unit can be simplified, and through different combination and expansion, requirements of launch of rockets in various models can be satisfied, and an ability to fast respond to faults appearing before the launch can be improved. The dynamic-pre-positioned measurement and control equipment dynamic relay cabinet modularized redundancy control system can be applied to dynamic-pre-positioned equipment or other single-unit products and can satisfy requirements of zero-window launch missions of the rockets.

Description

technical field [0001] The invention relates to a control system for measurement and control equipment, in particular to a modular redundant control system for power relay cabinets of power front measurement and control equipment. Background technique [0002] The pre-power measurement and control equipment is the supporting equipment for the power measurement and control system of the rocket launch site. Focus on all the control work in the stage, so the power front-end measurement and control equipment is required to have high reliability. If there is a failure in the pre-shooting process stage, it has the ability to quickly replace the response. The previous supporting front-end control equipment has shortcomings in the actual use process: First, the degree of integration is low, and the combination and interchangeability of each control module are poor, resulting in complicated cabinet configuration and state transition, and a long time to replace spare parts; second, al...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G05B9/03
Inventor 周绍志李春林范虹李超王立张波刘忠明袁学飞沈福东刘英
Owner BEIJING INST OF SPACE LAUNCH TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products