Hydropower station hierarchical scheduling method and system with combination of medium and long term forecasts
A technology for hierarchical dispatching and hydropower stations, which is applied in the fields of instrumentation, climate change adaptation, and data processing applications. The effect of improving adaptability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0053] A hierarchical scheduling method for hydropower stations combined with medium and long-term forecasts, comprising the following steps:
[0054] Step 1. Determine the design guarantee rate P (preferably 90%, 95%, etc.), and remove the damage year (the year in which the incoming water is less than the design dry year) from the long series of inbound runoff data according to the proposed design guarantee rate P, and select the guarantee rate. The inflow runoff series in the normal water supply year is used as the basis for the production of hierarchical scheduling diagrams.
[0055] Step 2: Divide the inflow runoff series in years with normal water supply into abundant (0% [0056] Step 3, divide the inflow runoff series into water storage period and water supply period to make a hierarchical scheduling map, which specifically includes the following sub-steps: [0057] (1)...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com