A technology of the main structure and connecting structure, which is applied in the direction of building structure and construction, can solve the problems of large force load at the connection point, difficult construction, complex connection nodes between the curtain wall and the main structure, etc., so as to improve the firmness and improve the construction quality. Efficiency, the effect of ensuring a single chip area
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0029] The connection structure between the heavy-duty GRC curtain wall system and the all-steel main structure in this embodiment is suitable for the reliable connection between the heavy-duty GRC curtain wall and the all-steel main structure when the cantilever length of the connecting corbel is less than or equal to 400 mm. The connection method of buried steel connection corbel + pin ensures the reliability of the connection between the GRC curtain wall structure with a large single area and heavy load and the all-steel main structure.
[0030] The connection structure between the heavy-duty GRC curtain wall system and the all-steel main structure in this embodiment includes the steel beam 7 of the all-steel main structure, the secondary steel member 1, the connecting corbel 4, two back-type connectors 8, two pieces of corbel Leg side connecting support plate 3, connecting lug plate 11, pin shaft 2, second stiffening plate 12, third stiffening plate 14, steel beam stiffenin...